Clash Categorization and Optimization in a Federated BIM Workflow for Integrating Temporary Shoring Systems and Permanent Structures in High-Rise Excavations
The integration of temporary support systems with permanent structural frameworks remains a complex challenge in high-rise construction, where traditional building information modeling (BIM) workflows often lack the coordination needed to optimize both simultaneously. This study addresses that gap through a federated B...