An Engineering Approach to Successful Cement Milling in a 3,777 m Long Interval Using Coiled Tubing in the Mahakam Field
Cement milling over long intervals presents significant operational challenges, particularly in highly deviated wells with extended measured depths. In the Peciko Offshore area of the Mahakam Field, a cement milling operation was required across a continuous 3,700 m interval in a well with approximately 70° deviation...