An intelligent multi-objective decision framework for Time–Cost–Quality optimization in construction scheduling using AHP and OBL–NSGA-III
Construction scheduling requires simultaneous optimization of project time, cost, and quality; however, most existing time–cost trade-off (TCTO) models inadequately incorporate construction quality as a quantitative optimization objective. This study proposes an intelligent hybrid decision framework that integrates the...