Reinforcement Learning-Based Dynamic Optimization Strategy of WAG Flooding with Inter-Well Connectivity for High Water-Cut Reservoirs
In high water-cut reservoirs, water flooding efficiency declines due to high-permeability channels that aggravate heterogeneity and cause water channeling. Gas flooding technology can improve recovery but is limited by operating conditions and costs. Water-alternating-gas (WAG) injection combines the advantages of both...