Multi‐Source Hydrogeological Investigation, Water Inflow Prediction, and Water–Mud Inrush Risk Zoning for a Strongly Karstified Limestone Tunnel: A Case Study of the Dongyang Tunnel
This study conducts a preconstruction assessment of the Dongyang Tunnel through three linked steps: multi‐source hydrogeological investigation, comparison of three water‐inflow prediction methods, and section‐based water–mud inrush risk assessment and zoning. The investigation integrated geological mapping, boreholes,...