Distributionally Robust Optimization for Permutation Flow Shop Scheduling with Sequence-Dependent Setup Times and Operational Cost Under Uncertainty in Industry 4.0 Manufacturing Systems
Production scheduling in sustainable manufacturing systems must cope with processing time uncertainty while maintaining operational efficiency and controlling operational costs. This paper proposes a Distributionally Robust Optimization (DRO) model for the permutation flow shop scheduling problem with sequence-dependen...