To meet the low-voltage, high-current, and long-duration requirements of thermal and dynamic stability tests for UHV disconnectors and earthing switches, this paper proposes a two-stage step-down test system powered by a 330 kV grid. The system employs a 12.5 MVA transformer (330 kV/35 kV) and a 90 MVA short-time-rated...
Zhi-Lin Kang, Yu-Lin Kang, Jian-Zhen An et al.· Journal of Physics, Conferen...· 0 citations
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.