We address the slab assignment problem arising from the steelmaking industry. A Slab is the first solid intermediate product in the steel production process, both as an output of steelmaking and as a raw material for hot rolling. In steel plants, a common operational task involves assigning slabs to customer orders as...
Motivated by walking beam heating systems, this paper studies the Parallel Semi-Continuous Batch Scheduling Problem with Incompatible Job Families (PSCBSP-IF) under processing time uncertainty. In this problem, the processing duration of each batch is jointly determined by the longest job in the batch, the batch size,...
In the manufacture-circulation industrial system (MCIS), the integration of production, inventory, and distribution planning is critical for operational efficiency and cost minimization. This paper addresses the challenges of coordinating production and distribution decisions in a MCIS with multiple distribution center...
Jia-Wen Cui, Li-Xin Tang, Gong-Shu Wang et al.· 2026 IEEE 22nd International...· 0 citations
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.