Skip to content

Author

Roman Obermaisser

1 paper indexed here

We haven’t gathered this author’s papers yet. Follow them and we’ll fetch their work.

Not the right person? Other researchers publish under this name.

Open access Aug 2026

Hierarchical Scheduler with Adaptive Time-Budget Reallocation for Time-Triggered Edge-Fog-Cloud Architectures

The lack of determinism restricts the integration of safety-critical applications into Edge–Fog–Cloud (EFC) architectures. Existing EFC schedulers are typically designed for dynamic, best-effort operation based on unmanaged resource allocation and elastic virtualization. This paradigm introduces unbounded queueing, resource contention, and timing jitter, making standard schedulers unsuitable for hard-deadline workloads. Moreover, most approaches focus on computational placement, while communication is abstracted or treated as a secondary cost term. As a result, bounded-latency routing and deterministic task execution are rarely co-optimized under a unified timing model. This paper addresses these gaps by utilizing a managed Time-Triggered Edge–Fog–Cloud (TTEFC) architecture that supports safety-critical workloads, orchestrates IEEE Time-Sensitive Networking (TSN) for local intra-domain communication, and uses IETF Deterministic Networking (DetNet) for routed inter-domain paths. On this infrastructure, a hierarchical genetic algorithm (HGA) is proposed to jointly schedule partition-to-execution-location allocation, partition execution order, inter-partition route selection, and negotiated per-partition time budgets that act as temporal boundaries for parallel partition-level optimizers. An adaptive slack reallocation operator redistributes unused temporal slack from over-satisfied partitions to budget-violating partitions, improving feasibility convergence. Experiments on synthetic DAG workloads with 100–500 tasks compare the proposed HGA against HEFT and round-robin baselines. These baselines are included as scoped external references to contextualize the end-to-end scheduling performance of the proposed method. Ablation results show that slack reallocation improves partition-budget feasibility, reaches feasible budget assignments earlier, and produces tighter budget–makespan alignment than feedback-free and static-budget variants. An automotive-characteristic DAG case study further evaluates the method on an application-oriented workload under the same timing and communication assumptions.

Omar Hekal, Josepaul Paulachan, Daniel Onwuchekwa et al. · 0 citations