Monte Carlo tree search for the multi-crane scheduling problem with temporal constraints
This study addresses the multi-crane scheduling problem with temporal constraints (MCSPTC) arising in steelmaking shops, where multiple rail-guided overhead cranes transport materials on shared tracks and must strictly avoid interference. The problem requires jointly determining task assignment and sequencing decisio...