Acid Mine Drainage Treatment Using a Sulfidogenic Bioreactor and Selective Two-step Precipitation of Multiple Metal(loid)s
This study investigated the treatment of acid mine drainage (AMD) and the precipitation of metals and metalloids using sulfur species delivered in gaseous and liquid forms. An up-flow sulfidogenic reactor was operated for 58 days to obtain stable sulfate-reducing conditions. Under the final operating conditions, th...