A Techno-Economic Study on the Planning of Solar Power Plant Upgrades Using the AHP Method on Neira Island, Central Maluku
Maluku Province has significant solar energy potential; however, the utilization of the Solar Power Plant (Pembangkit Listrik Tenaga Surya [PLTS]) on Banda Neira Island has remained suboptimal because the facility, which was originally constructed in 2012, ceased operation in 2017. This condition has resulted in contin...