Multi-Objective Optimization of Resource-Constrained Construction Scheduling for Power Transmission and Distribution Projects Considering Prefabricated Components
Research on low-carbon construction in power transmission and distribution (PTD) projects has mainly focused on carbon accounting and emission-reduction assessment, with limited consideration of construction method differences and shared resource constraints. This study proposes a multi-objective optimization method fo...