Skip to content

Agile Software Cost Estimation Model Based on Constricted Particle Swarm Optimization

Aug 2026 · Journal of Software: Evolution and Process · Vol 38 · 0 citations · 39 references

TL;DR

The results indicate that CPSO can effectively tune the Agile cost estimation model within the specific dataset and experimental setting considered in this study, and provide parameter‐level insights that may support future calibration of agile cost estimation models on larger and more heterogeneous datasets.

Abstract

Cost estimation is a critical task in software engineering and is particularly challenging in Agile projects. Although various optimization methods have been proposed to improve estimation accuracy, estimates often still deviate from actual costs. This study proposes the use of Constricted Particle Swarm Optimization (CPSO) to tune an Agile cost estimation model. Based on data from 21 industrial Agile software development projects, the model uses historical story points, team velocity, team wages, and workdays as input features. The performance of the CPSO algorithm is then systematically evaluated on this small dataset. The model is reparameterized with four tunable parameters— α,C,D$$ \alpha, \kern0.3em C,\kern0.3em D $$ , and E$$ E $$ —and CPSO is applied to minimize MMRE on the training folds to obtain optimal parameter sets. Evaluation is carried out using outer fivefold cross‐validation, with hyperparameter tuning performed on the training data, and performance is compared with a standard PSO baseline and the results reported by Zia et al. The CPSO‐optimized model achieves an MMRE of (4.74% ±$$ \pm $$ 1.89%) on test folds and a PRED (10%) of (96.00% ±$$ \pm $$ 8.94%). The MMRE represents a 9.71% relative reduction compared with the employed baseline and a 17.71% relative reduction compared with the result reported by Zia et al. The contribution of this study lies in systematically embedding CPSO into an identifiable agile cost estimation model and evaluating it within a rigorous outer‐layer cross‐validation and ensemble prediction framework. The results indicate that CPSO can effectively tune the Agile cost estimation model within the specific dataset and experimental setting considered in this study. The findings should be interpreted as an incremental contribution based on a small industrial dataset, and they provide parameter‐level insights that may support future calibration of agile cost estimation models on larger and more heterogeneous datasets.

View source

Similar papers

Review

Evaluation of Software Effort Estimation Methods for Machine learning techniques

A review of deferent machine learning methods that are using for effort estimation like regression models, decision trees, random forest, neural networks, and then evaluate this models based on performance criteria such as MAE (Mean Absolute Error) and R 2 Score.

Montaser Fadulalla Ahmed Adam, Haroun Abdalla Eissa · 0 citations
Open access Aug 2026

AI-Driven Cost Estimation in Shipbuilding: A Hybrid Framework Integrating PSO and XGBoost

Accurate shipbuilding cost estimation is important for project quotation, budget preparation, cost control, and operational decision-making. This study proposes an AI-driven hybrid framework for shipbuilding cost estimation by integrating particle swarm optimization (PSO) with the extreme gradient boosting (XGBoost) al...

Yifan Su, Guanghua Xu, Jing Yang · 0 citations
Preprint Sep 2026

A Surrogate-based Approach for Fast Multi-objective Architectural Refactoring Optimization

Surrogate models constitute a promising approach for scaling multi-objective architecture optimization to larger spaces and complex architectural models and maintain the Pareto front quality provided by evolutionary algorithms.

J. A. Díaz-Pace, Daniele Di Pompeo, Antonela Tommasel · 0 citations
Review Open access 2026

Cost Predictive Model Adoption in Construction Organisations: A Pilot study

Accurate construction cost estimation is essential for effective project planning, budgeting, and decision-making. The increasing complexity of construction projects has accelerated the adoption of advanced cost predictive models that complement traditional estimation techniques. However, limited empirical evidence exi...

Hanafi bin Ab. Haris, Norhazren Izatie Mohd, Hamizah Liyana Tajul Ariffin et al. · 0 citations
Conference Sep 2026

Research on production decision optimization based on Monte Carlo algorithm

In the context of optimizing enterprise production processes, this paper focuses on the design of sampling inspection schemes and decision-making models that enhance cost control, production efficiency, and product quality. A sequential sampling method is employed to minimize the number of inspections while maintaining...

Shu Lei, Ming-Han Li, Xu-Yuan Cheng · 0 citations
Open access Aug 2026

Improving Software Effort Estimation Through Feature Selection and Optimized SVR

An integrated Whale Optimization Algorithm–Support Vector Regression (WOA-SVR) framework that simultaneously optimizes binary feature selection and continuous SVR hyperparameters within a unified search process is proposed.

R. Putri, G. E. Yuliastuti, Citra Nurina Prabiantissa · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.