A voltage ride-through (VRT)-aware data center and grid co-planning framework that couples transmission-level fault simulation with an internal data center ride-through model is presented and shows that internal VRT capability can become a binding interconnection constraint.

Abstract

Large data centers are emerging as concentrated, power-electronic grid loads whose abrupt disconnection or transfer to on-site backup supply during voltage disturbances can remove large demand from the power system, and may create a system-level stability problem. Their interconnection feasibility therefore depends not only on steady-state thermal and voltage limits, but also on whether internal power-conditioning systems can maintain IT service while limiting customer-initiated load reduction. This paper presents a voltage ride-through (VRT)-aware data center and grid co-planning framework that couples transmission-level fault simulation with an internal data center ride-through model. Python-based dynamic simulations generate point-of-interconnection (POI) voltage trajectories under selected network faults, and the resulting waveforms drive an internal model incorporating IT and cooling-load dynamics, DC-link, Uninterruptible Power Supply (UPS) response, and converter apparent power limits. The IEEE 118-bus case study shows that internal VRT capability can become a binding interconnection constraint: steady-state planning alone can overestimate feasible data center capacity, whereas increased UPS converter headroom progressively restores hosting capacity. Under the reduced-order response models studied, the grid-forming mode provides greater ride-through margin than the current-limited grid-following mode under the same network fault conditions. The results further show that VRT constraints can materially change both the total hosting capacity of data centers and its spatial allocation across candidate interconnection buses.

View source

Similar papers

Preprint Sep 2026

Equivalent Modeling of Load-Side Systems With Distributed Renewable Generation Considering Fault Responses and Nodal Voltage Coherence

Operating conditions and fault severity change both the initial states and control modes of active distribution networks. Direct capacity aggregation can therefore lose the power responses required for transmission-system dynamic analysis. This paper develops a procedure for generating low-order physical electromagneti...

Yu-Qi Cao, Chen Shen, Shao-Wei Huang et al. · 0 citations
Open access Aug 2026

Modelling and Simulation of a 330 kV Power Transmission Network with FACTS Devices

The increasing demand for electrical energy, coupled with constrained expansion of physical transmission infrastructure, has placed significant operational stress on high-voltage power transmission networks. In Zambia, the 330 kV transmission system serves as the backbone of bulk power transfer, interconnecting major g...

Benjamin Godfrey Zulu, Ngoma Amos, Chanda Innocent · 0 citations
Open access Sep 2026

Optimal Configuration of Grid-Forming Energy Storage Considering PV Transient Voltage Support Capability

To address rapid frequency decline, transient voltage violations, and excessive configuration costs caused by competition between active and reactive power support in weak grids, this paper proposes an optimal configuration method that incorporates the fault-period voltage-support capability of photovoltaic (PV) invert...

Huiqiang Zhi, Long-Fei Hao, Xiao Chang et al. · 0 citations
Review Open access Aug 2026

Power distribution system blackstart restoration using renewable energy

Large-scale blackouts continue to expose the fragility of traditional top-down restoration, where end users remain de-energized until bulk generation and transmission are recovered. The rapid growth of inverter-based distributed energy resources (DERs) creates a credible alternative: bottom-up blackstart, in which grid...

Wen-Long Shi, Cong Bai, Zhao-Yu Wang · 0 citations
Open access Sep 2026

Analysis of virtual power plant performance for voltage stability in distribution networks with high DER penetration using PowerFactory-Python co-simulation: An Aotearoa New Zealand case study

The way power systems operate is being reshaped by the high penetration of distributed energy resources (DERs) such as rooftop solar, batteries and electric vehicles in low-voltage distribution networks. These technologies, although beneficial for decentralization and decarbonization, pose significant technical challen...

Mariam Mujtaba, Daniel Burmester · 0 citations
Preprint Aug 2026

Steady-State Equivalent Circuit Model for Data Center Loads

Planners currently represent data centers as aggregate constant-PQ or ZIP loads in steady-state interconnection and contingency studies. These aggregate models are computationally convenient. However, they obscure the electrical relationship between computational workloads, server utilization, and grid-side demand. The...