A novel hybrid method integrating physics-informed neural network (PINN) and Gaussian process regression (GPR) that enforces the B4 creep model as a physics-informed constraint by embedding its governing equations into the loss function, effectively incorporating physical knowledge into data-driven training.
Zhiren Tao, Jian-Xin Peng, Shijie Liao et al.· Journal of materials in civi...· 0 citations
We developed a computationally efficient and accurate surrogate model to assess key descriptors of fracture geometry during reservoir stimulation associated with unconventional subsurface energy scenarios. The work is motivated by the observation that accurate quantification of fracture length, width, and height is k...
Buried horizontal cylindrical tanks are susceptible to stress instabilities, such as shell buckling and weld fatigue, under nonuniform ground settlement. Classical Terzaghi-based earth pressure theories simplify key parameters into static constants, rendering them inadequate for capturing the dynamic soil-tank inte...
Quanen Li, Yu Zhang, Sheng-Jie Di et al.· Journal of computing in civi...· 0 citations
Fast and accurate prediction of transient thermalhydraulic parameters is essential for reliability assessment and safety-margin evaluation in safety-critical nuclear reactor components. However, high-fidelity computational-fluiddynamics simulations are computationally prohibitive for the many-query scenarios required b...
Yu-Zhao Ye, Xiao-Meng Dong, An-Qi Xu et al.· 2026 8th International Confe...· 0 citations
The prediction of time‐dependent pile settlement remains challenging due to the nonlinear behavior of saturated clay soils, consolidation, and pile setup effects. The complexity of this phenomenon is not fully captured by classical elasticity theories. This study develops a hybrid model for time‐dependent pile settleme...
Gbênihon Céleste-Amour Kenoukon, Joseph Ng'ang'a Thuo, Kiplagat Chelelgo et al.· Engineering Reports· 0 citations
Crest cracking represents a pervasive structural hazard during the construction and operational phases of high earth-core rockfill dams (ECRDs); consequently, the development of history-matched numerical tools is rendered an engineering necessity to prevent catastrophic risks. To address the limitations inherent in tra...
Serges Mendomo Meye, Paul F. Nguema· Journal of engineering and a...· 0 citations
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.