Aug 2026· 2026: Transforming Construction with Off-Site Methods and Technologies (TCOT)· 0 citations
Abstract
Contingency estimation methods are largely misapplied in the construction industry and currently align inadequately with risk and cost-overrun. The work discussed here addresses this gap, to present a newly developed structured mechanism to help the project-team choose an appropriate calculation method based upon project type, supply chain, and (on & off) site complexities to minimise cost overrun. Three contingency estimation methods, namely: deterministic methods; probabilistic methods; and, modern mathematical methods are reviewed, then, using a mixed-methods research approach that includes qualitative semi-structured interviews with key Western-Australian industry experts to build necessarily upon relevant secondary research, the work presents a means to select a best estimation method, depending on the project’s (on or off) site circumstances. This work clarifies that deterministic methods can be used for simple, repetitive and low complex projects and supply chains - suitable contingency percentages can be applied from past, similar project risk factors and complexities; it is determined here that this estimation method provides a simple and quick decision-making tool to determine the project contingency. On the other hand, complex and large-scale projects, typically with a multitude of uncertainties and risks, are apt to incur additional costs and delay the project; thus, the project team can be guided towards individual risk events, calculate the consequences in terms of cost and time, and finally define risk mitigation strategies. A structured mechanism is presented that allows precedential experience, (on or off) site conditions, internal and external factors, and key risk events’ identification, to guide choice of the most appropriate, contingency estimation analyses method for a project at hand.
Accurate cost forecasting is fundamental to construction project management, yet the basis for selecting appropriate forecasting methods across different project conditions remains insufficiently articulated in the literature. This paper presents a structured conceptual review classifying construction cost forecasting...
A. Muḥammad, Muhammad Tariq, Andrea Eross· 2026: Transforming Construct...· 0 citations
In Nigeria, there have been insufficient studies in the field of risk-related cost variability. Due to unreliable cost estimation, variations in cost, length, and quality are the direct implications. Cost estimating is difficult, mainly when dealing with uncertainties. The study aims to develop a construction project e...
Babatunde Dosumu, O. Ejohwomu, A. Yunusa-Kaltungo· Construction Business and Pr...· 2 citations
The construction industry heavily relies on highly efficient supply chain management (SCM) to ensure project success, minimize costs, and guarantee timely delivery. This study evaluates the supply chain performance of a construction project at PT. Bingkai Langit Construction, which experienced material procurement cons...
I. G. A. D. Pramesti, Gusti Dharmayanti, Anak Agung Diah Parami Dewi· Jurnal Ilmiah Telsinas Elekt...· 0 citations
Supply chain continuity is a major priority for organisations operating in high-risk and
volatile environments, particularly within the oil and gas sector. The Shell Petroleum
Development Company (SPDC), operating in Nigeria’s Niger Delta, contends with persistent
operational challenges such as pipeline vandalism, crud...
N. Nwiepe· INTERNATIONAL JOURNAL OF SOC...· 0 citations
Engineering, Procurement and Construction (EPC) projects play a pivotal role in infrastructure and industrial development in Nigeria but continue to experience significant schedule delays and cost overruns arising from engineering complexity, procurement uncertainty, macroeconomic volatility, and regulatory constraints...
A. Adeodu, T. Ojo, Margaret Emmen Ogunbiyi· ABUAD Journal of Engineering...· 0 citations
Off-site construction has been promoted as a solution to persistent challenges in the construction industry, including low productivity, labour shortages, cost overruns, and schedule delays. While many studies have focused on technical and process optimizations, procurement remains an underexplored factor influencing t...
S. Montazeri, Rejsha Khoteja, Andrew Williamson et al.· 2026: Transforming Construct...· 0 citations