Localising global construction delay risk factors: an optimisation-enhanced expert consensus framework for the Australian construction industry

Aug 2026 · Smart and Sustainable Built Environment · pp. 1-22 · 0 citations · 76 references

Abstract

This study aims to investigate how globally identified construction delay factors can be translated into a framework that accurately reflects Australian project conditions. It aims to develop a validated set of delay risks by integrating systematic evidence synthesis with expert elicitation and optimisation-based consensus analysis. A systematic literature review consolidated 103 global delay factors, refined to 55 using a relevance-based filtering approach. Semi-structured interviews with senior Australian practitioners were conducted to assess contextual severity. Inter-rater agreement was measured using Kendall's Coefficient of Concordance (W), and a Genetic Algorithm (GA) was applied to optimise expert weighting and maximise consensus reliability, producing a statistically robust prioritisation. The optimisation process achieved strong expert agreement and generated a refined set of delay risks tailored to Australian project conditions. The most influential delays stem from governance and design-related issues, including late owner decisions, documentation delays, unclear drawings, and coordination challenges, alongside labour constraints and subcontractor performance. Cross-validation and triangulation with recent Australian studies confirmed the stability and contextual relevance of the final framework. The 22-factor framework provides practitioners with a clear basis for identifying and prioritising delay risks within Australian projects. By guiding planning and design decisions, it helps reduce schedule uncertainty and improve the predictability of project delivery. This research advances construction risk analysis by introducing an optimisation-enhanced localisation method that integrates global evidence, expert judgement, and evolutionary algorithms to produce a validated delay risk framework for Australia. The combined use of GA-based expert weighting and Kendall's W strengthens consensus reliability and offers a transparent methodological innovation to the field.

Read PDF

Similar papers

Review Open access Sep 2026

Towards an Effective Risk Management Framework for Large-Scale Infrastructure Projects

Large-scale infrastructure projects (LSIPs) frequently exceed budgets and schedules despite the accessibility or the adoption of risk management frameworks (RMFs). This study addresses or discusses two gaps: the lack of triangulated evidence on why structurally sound frameworks such as ISO 31000 and PMBOK remain proced...

Fairooz Ferdous, Mickael Sassine, A. Saravana et al. · 0 citations
Review Open access Sep 2026

Critical success factors influencing the successful implementation of performance-based contracts for road maintenance

This study investigates the Critical Success Factors (CSFs) for implementing performance-based contracts (PBCs) in road maintenance within Saudi Arabia (KSA). Despite the successful implementation of PBCs in countries such as Australia, New Zealand, the United States of America (USA), and the Netherlands, KSA continu...

Badr T. Alsulami, Mohammed Alhamed, F. Ullah · 0 citations
Review Open access Sep 2026

A multi-criteria approach to risk assessment and mitigation in UAE oil and gas construction projects: a hybrid Delphi–Fuzzy AHP framework

Oil and gas construction projects (O&GCPs) are among the most complex and high-stakes endeavors in the world. In the UAE, these projects operate under demanding safety and regulatory environments, yet persistent risk-related disruptions continue to undermine project performance. Existing risk management frameworks rare...

Raghad Almashhour, Abroon Qazi, M. K. Al-mhdawi · 0 citations
Review Open access 2026

Water Governance and Infrastructure Resilience Risk Governance and Resilient Water Infrastructure Delivery in Mufulira District, Zambia: A Qualitative Case Study

Reliable water infrastructure is a natural-resource-management priority in mining and industrial districts, where service systems are exposed to financial, technical, environmental, institutional and operational uncertainty. This study examined how risk-management practices shape water-infrastructure delivery and servi...

C. Zulu, Jonathan Phiri, Elizabeth Zyambo · 0 citations
Open access Oct 2026

Development of a climate-adaptive flood defence index to support planning and design decisions

Climate change is increasing uncertainty in flood defence infrastructure (FDI) planning and design, challenging conventional approaches based on historical conditions and fixed design thresholds. This study develops a Climate-Adaptive Flood Defence Index (CAFDI) as a practical decision-support framework for assessing...

B. H. Nguyen · 0 citations
Review Open access Sep 2026

Comparative Evaluation of the TANROADS Road Maintenance Management System (RMMS) against MCDA Practice: Systematic Review - A Case of Tanzania

The RMMS employed by TANROADS provides a structured, multi-criteria analysis (MCA) framework for prioritising maintenance interventions on trunk and regional roads. This study reviewed the literature to assess RMMS effectiveness against international MCDA practice, identify implementation barriers, and propose o...

Eliesikia Mrutu, R. Tekka, Yazid Mwishwa · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.