Skip to content
Open access

Information Flow and Logistics Coordination Challenges in Saudi Arabian Construction Projects: A SCOR-Based Qualitative Investigation

Aug 2026 · Logistics · 0 citations · 29 references

Abstract

Background: This study investigates information-flow and logistics coordination challenges in Saudi Arabian construction projects within the context of ongoing national infrastructure developments, severe climatic conditions, and evolving labor regulations. Methods: Utilizing the Supply Chain Operations Reference (SCOR) framework, semi-structured interviews were conducted with 29 construction professionals spanning site-level engineers, logistics managers, project executives, and material suppliers over an extended 20-month monitoring period (March 2024–October 2025). Data were analyzed using thematic coding and mapped across the SCOR domains. Results: The findings reveal that logistics vulnerabilities stem predominantly from systemic information-sharing deficiencies, fragmented digital workflows, and weak stakeholder integration rather than standalone material constraints. Operational disruptions across Plan, Source, Make, Deliver, and Return are compounded by region-specific barriers including extreme thermal stress, migrant labor turnover, and high administrative fees for reverse logistics. Conclusions: To address these challenges, the study formulates a tiered, context-adjusted deployment framework for digital integration (BIM, IoT, and real-time tracking) tailored for both large infrastructure schemes and small-to-medium contractors. Staged implementation pathways and policy recommendations are provided to enhance supply chain resilience.

Read PDF

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.