Skip to content
Open access

Data-Driven Flexibility Envelopes From AMI for Reliable Grid-Interactive Load Dispatch in Cooling-Dominated Power Systems

2026 · IEEE Access · Vol 14, pp. 119433-119448 · 1 citation · 45 references
Computer Science

Abstract

Incorporation of large controllable loads into grid services requires operationally viable flexibility constraints that is operationally viable. Here, empirical flexibility denotes the demand-side operating envelope — hourly capacity bounds, ramp-rate limits, and an energy-neutrality tolerance — inferred directly from measured AMI load variability rather than from assumed or model-based parameters. Existing methods often rely on engineered assumptions or parameters which are obtained using simulation. This paper presents a data-driven approach for deriving empirical flexibility envelopes, namely, ramp-rate limits, hourly capacity limits, and four-hour cumulative-curtailment constraints, derived directly from Advanced Metering Infrastructure (AMI) data. This approach was applied to 300 residential meters in a cooling-dominated environment in Saudi Arabia, with 5.25 million raw 30-minute intervals, and 5.06 million intervals passed a stringent quality-assurance test throughout a one-year period. The integrity of the measurements before the flexibility data extraction is guaranteed by a three-step quality-assurance procedure that includes physics-based validation, temporal-cadence validation, and cross-validation with cumulative energy registers (R $2=0.985$ , RMSE = 5.66 kWh/day). The resulting envelopes are strongly seasonally asymmetric: the average load in the hot season is 51% higher than in the mild season, and the flexibility ratios remain stable at 45–55%, indicating that percentage-based constraints are seasonally robust. These empirical parameters are imposed as hard constraints in a closed-loop Model Predictive Control (MPC) simulation of an aggregated-load proxy. Across four 48-h price scenarios, including a case with 20% forecast-error injection, all MPC problems remained feasible and the optimized trajectories satisfied the imposed capacity, ramp, and cumulative-curtailment constraints. Under time-of-use pricing, the controller reduced simulated cost by 22.7% and peak demand by 16.4% relative to the defined simulation baseline. These results establish internal consistency of the constrained simulation; they do not constitute field validation of physical load deliverability. The results indicate that measurement-derived constraints yield constraint-compliant simulated dispatch and reduce the parameter mismatch associated with assumed envelopes. The findings are simulation-based and not a field-deployment validation.

Read PDF

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.