Battery-swapping stations (BSSs) can shorten electric-vehicle energy replenishment while using centrally managed battery inventories as flexible grid-connected storage. Realizing both benefits requires the station to schedule charging, grid discharge, and swapping service before future customer demand and electricity prices are known. This paper develops a forecast-aware rolling-horizon operating framework for this problem. A lightweight DLinear model predicts 24-hour price and demand trajectories, Stein variational gradient descent quantifies their uncertainty through representative scenarios, and a two-stage stochastic model predictive controller converts those scenarios into station decisions. The controller accounts for service shortfall, terminal readiness, a protected service buffer, and electrochemical degradation without assuming perfect future information. The application contribution is an implementable controller that coordinates the station's mobility-service and energy-storage roles. The methodological contribution is a modular forecast-to-control interface that separates the operational value of mean-forecast accuracy from that of uncertainty representation. In a 120-day closed-loop evaluation, DLinear-SVGD SMPC achieves the lowest cost among the implementable controllers. Relative to deterministic DLinear MPC, it reduces final cost by 1.2\% and service-shortfall hours by 80.7\%, with 99.10\% of the evaluated hours free of shortfall.
Renewable power plants with co-located battery energy storage systems (BESSs) coordinate forecast-deviation control, renewable-surplus management, electricity-price arbitrage, and ancillary-service commitments through the shared power and energy capability of the battery. This study develops a layered framework for sce...
Jing Hu, Yan-Hao Wang, Na-Na Li et al.· Energies· 0 citations
: Battery swapping separates a vehicle's stop from battery charging, creating flexibility but coupling station location and capacity to battery inventory, queues, and local grid limits. This focused review examines 31 road-vehicle battery swapping station studies and one broader infrastructure review published through...
Shi-Yun Tong· Academic Journal of Business...· 0 citations
Planning en-route charging and battery-swapping infrastructure for long-haul battery-electric trucks (BETs) requires models that reflect how trucks actually operate. This paper develops a mixed-integer programming framework that jointly sites charging or swapping stations and schedules each truck's charging, swapping a...
: To address the scheduling challenges caused by uncertainties in both photovoltaic (PV) generation and charging demand at solar-powered stations, a stochastic multi-timescale scheduling approach is introduced for PV-storage charging stations. In the day-ahead scheduling phase, a Copula-based joint scenario generation...
He Jiang, Xin-Yu Wang, Zong-Jun Yao et al.· Energy Engineering· 0 citations
Electrified container ports are coupled logistics–energy systems in which uncertain vessel arrivals determine berth occupancy, shore-power activation, cargo-handling intensity, and the residual demand balanced by renewable generation, battery storage, and the utility grid. This study develops a scenario-based stochasti...
S. R. Samaei, K. S. Reddy, James Riffat· Energy Catalyst· 0 citations
Day-ahead battery arbitrage requires assessing the return and downside risk of complete charge–discharge cycles. We propose Scenario-Conditioned Risk Optimization (SCARO), which corrects supply and demand forecasts and maps jointly resampled whole-day residuals to price paths. An exact planner identifies adverse outcom...