An Empirical Assessment of Delay Factors in Road Maintenance Projects Using PLS-SEM

2026 · Nile Journal of Engineering and Applied Science · 0 citations

Abstract

This study empirically examines the determinants of time overrun in road maintenance projects in North Central Nigeria, using Partial Least Squares Structural Equation Modeling (PLS-SEM) to analyze interrelationships among multiple latent constructs. Data were collected via structured questionnaires from project managers, contractors, consultants, and government officials, covering nine dimensions: contractor-related, owner-related, consultant-related, utility service-related, regulatory, project-specific, and external, equipment and material-related factors, and time overrun. Measurement model assessment demonstrated satisfactory reliability and validity, while the structural model revealed that contractor-related, owner-related, project-specific, and utility service-related factors significantly predict time overrun, accounting for 76.4% of its variance. Consultant, regulatory, external, and equipment/material factors were not significant in this context. These findings corroborate prior research emphasizing the systemic and multidimensional nature of delays in road projects. The study contributes theoretically by validating a context-specific multidimensional delay framework and demonstrates the utility of PLS-SEM in infrastructure research. Practically, the results provide actionable insights for improving contractor performance, enhancing owner decision-making, and strengthening utility coordination, thereby mitigating schedule delays and enhancing project delivery outcomes.

View source

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.