Construction contract durations are fixed during procurement, yet delivery often changes after risks materialize and formal extensions of time are approved. Although delays, extension-of-time claims, change orders, and risk-based duration estimation are well studied, less is known about how contract-amendment records can be converted into duration multipliers for planning. This paper develops a quantitative, document-based Risk-Calibrated Duration Multiplier framework linking initially contracted duration, approved extensions, and documented risk causes. The framework was applied to 197 signed works contracts from 60 projects within a broader portfolio of 63 EU-funded water and wastewater infrastructure projects, predominantly administered under FIDIC Red and Yellow Book conditions. The analysis combined duration multipliers, impact-weighted attribution of multi-risk amendments, risk-time coefficients, bootstrap uncertainty assessment, concentration indicators, benchmark regression models, and reconstruction validation. For completed contracts, the mean multiplier was 1.372, with P50, P80, and P90 values of 1.233, 1.635, and 1.886. Public-law procedural and design risk categories accounted for 60.9% of the total extension premium. The results show that contract-amendment records can be transformed into statistically interpretable planning parameters and used as a portfolio learning and contract-governance tool for more realistic infrastructure contract planning.
Probabilistic risk management has become central to delivering safer and more resilient building projects under growing cost, schedule, and sustainability pressures. This study synthesizes how probability-based approaches have been applied in building-related risk research and identifies unresolved gaps that limit thei...
Dariyono, Oei Fuk Jin Oei Fuk Jin· Jurnal Teknik Sipil dan Arsi...· 0 citations
This study examines how FIDIC contracts operate in practice within international construction projects, with particular attention to risk allocation, dispute resolution, and sustainability-related obligations. Although FIDIC forms are designed to provide standardized contractual frameworks, their practical effectivenes...
Hamza Ali, Suleiman Alayaydeh, Mahasen Khalaf et al.· Journal of Intelligent Decis...· 0 citations
Background: Despite the growing adoption of hybrid contract models in construction, energy, and agricultural procurement, there remains a significant gap in understanding how lump-sum and unit-price contracts differentially allocate risk across sectors and country contexts. This study addresses this gap by examining ri...
Robert Daniel Zebua, O. Jin· Equivalent: Jurnal Ilmiah So...· 0 citations
The article examines the modeling of contracting processes in the Ukrainian defense procurement system amid elevated financial and operational risks. The study systematized the principal risk factors affecting contracting decisions and substantiates the need to translate risk assessment results into specific contractua...
L. Tsiukalo, O. Panukhnyk, T. Ostapchuk et al.· Ukrainian Journal of Applied...· 0 citations
Model-based life-cycle evaluation indicates that AI-optimized PPP contracts reduce bridges reaching emergency condition by 30%–40% over a 30-year horizon while lowering life-cycle costs by 8%–12% compared with rule-based policies, providing infrastructure agencies and private concessionaires with an integrated AI-drive...
Ali Shehadeh, Odey Alshboul· Journal of Legal Affairs and...· 0 citations
Cost risk allocation remains a key challenge in EPC-mode power engineering projects, where technical, market, and operational uncertainties can affect project delivery and lifecycle costs. This study investigates contractual governance mechanisms for optimizing cost risk distribution, using the DART (Definability, Affo...