From Contract Amendments to Risk-Calibrated Duration Multipliers: A Statistical Framework for Realistic Construction Contract Planning

Jul 2026 · Buildings · Vol 16, pp. 2652 · 0 citations · 57 references

Abstract

Construction contract durations are fixed during procurement, yet delivery often changes after risks materialize and formal extensions of time are approved. Although delays, extension-of-time claims, change orders, and risk-based duration estimation are well studied, less is known about how contract-amendment records can be converted into duration multipliers for planning. This paper develops a quantitative, document-based Risk-Calibrated Duration Multiplier framework linking initially contracted duration, approved extensions, and documented risk causes. The framework was applied to 197 signed works contracts from 60 projects within a broader portfolio of 63 EU-funded water and wastewater infrastructure projects, predominantly administered under FIDIC Red and Yellow Book conditions. The analysis combined duration multipliers, impact-weighted attribution of multi-risk amendments, risk-time coefficients, bootstrap uncertainty assessment, concentration indicators, benchmark regression models, and reconstruction validation. For completed contracts, the mean multiplier was 1.372, with P50, P80, and P90 values of 1.233, 1.635, and 1.886. Public-law procedural and design risk categories accounted for 60.9% of the total extension premium. The results show that contract-amendment records can be transformed into statistically interpretable planning parameters and used as a portfolio learning and contract-governance tool for more realistic infrastructure contract planning.

Read PDF

Similar papers

Review Open access Jul 2026

PROBABILITY-BASED RISK IN BUILDING PROJECTS: A MULTIDIMENSIONAL SYSTEMATIC REVIEW ACROSS RISK TYPES, PROJECT STAGES, AND BUILDING USES

Probabilistic risk management has become central to delivering safer and more resilient building projects under growing cost, schedule, and sustainability pressures. This study synthesizes how probability-based approaches have been applied in building-related risk research and identifies unresolved gaps that limit thei...

Dariyono, Oei Fuk Jin Oei Fuk Jin · 0 citations
Open access Jul 2026

FIDIC Contracts, Risk Allocation, and Sustainability in International Construction: Comparative Lessons from Mega Projects

This study examines how FIDIC contracts operate in practice within international construction projects, with particular attention to risk allocation, dispute resolution, and sustainability-related obligations. Although FIDIC forms are designed to provide standardized contractual frameworks, their practical effectivenes...

Hamza Ali, Suleiman Alayaydeh, Mahasen Khalaf et al. · 0 citations
Review Open access Aug 2026

Risk Mitigation Strategies in Lump Sum and Unit Price Contracts: A Document Analysis and Thematic Synthesis

Background: Despite the growing adoption of hybrid contract models in construction, energy, and agricultural procurement, there remains a significant gap in understanding how lump-sum and unit-price contracts differentially allocate risk across sectors and country contexts. This study addresses this gap by examining ri...

Robert Daniel Zebua, O. Jin · 0 citations
Sep 2026

Modeling contracting processes in the defense procurement system under conditions of heightened financial and operational risks

The article examines the modeling of contracting processes in the Ukrainian defense procurement system amid elevated financial and operational risks. The study systematized the principal risk factors affecting contracting decisions and substantiates the need to translate risk assessment results into specific contractua...

L. Tsiukalo, O. Panukhnyk, T. Ostapchuk et al. · 0 citations

AI-Enabled Performance-Based Procurement and Life-Cycle Maintenance of Highway Bridges: Integrating Single-Bid Risk Analytics and PPP Payment Optimization

Model-based life-cycle evaluation indicates that AI-optimized PPP contracts reduce bridges reaching emergency condition by 30%–40% over a 30-year horizon while lowering life-cycle costs by 8%–12% compared with rule-based policies, providing infrastructure agencies and private concessionaires with an integrated AI-drive...

Ali Shehadeh, Odey Alshboul · 0 citations
Open access Aug 2026

Contractual Governance of Cost Risk Allocation in Power Engineering Projects under the EPC (Engineering, Procurement, and Construction) Contracting Model

Cost risk allocation remains a key challenge in EPC-mode power engineering projects, where technical, market, and operational uncertainties can affect project delivery and lifecycle costs. This study investigates contractual governance mechanisms for optimizing cost risk distribution, using the DART (Definability, Affo...

W.-W. Wang, Y.-L. Zhuang · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.