A Robust Iterated Greedy Algorithm for Distributed Flow Shop Scheduling with Uncertain Inter-Factory Transportation Times

Oct 2026 · Systemic Analytics · 0 citations

Abstract

This study investigates the Distributed Flow Shop Scheduling Problem with Inter-Factory Transportation (DFSPT) under uncertain transportation times. In real-world manufacturing systems, the duration of inter-factory transfers is subject to fluctuations caused by various factors, including traffic congestion, adverse weather conditions, and logistical constraints. To model such variations, a comprehensive robust optimization framework based on the uncertainty budget approach is developed, which incorporates transportation time deviations without requiring any probabilistic distribution assumptions. Within this framework, the robust DFSPT model is formulated as a mixed-integer linear programming (MILP) model, where specific protection levels are defined for each job and machine. Furthermore, to address large-scale instances, the greedy iterative algorithm introduced by Becker et al. (2025) is extended by replacing the deterministic scheduling evaluation mechanism with a worst-case makespan estimation approach based on critical path analysis under uncertain conditions. Computational experiments conducted on 900 benchmark instances demonstrate that the proposed approach can reduce the worst-case production time by up to 15.3% compared with deterministic models that neglect uncertainty effects, while imposing only a 4.2% average increase in nominal production time. Therefore, the proposed methodology provides an effective and practical decision-support tool for managing risks arising from uncertainty in inter-factory transportation and enhancing scheduling decisions in multi-factory manufacturing networks.

Read PDF

Similar papers

Open access Sep 2026

Distributionally Robust Optimization for Permutation Flow Shop Scheduling with Sequence-Dependent Setup Times and Operational Cost Under Uncertainty in Industry 4.0 Manufacturing Systems

Production scheduling in sustainable manufacturing systems must cope with processing time uncertainty while maintaining operational efficiency and controlling operational costs. This paper proposes a Distributionally Robust Optimization (DRO) model for the permutation flow shop scheduling problem with sequence-dependen...

Hafsa Mimouni, A. Jalid, Said Aqil · 0 citations
Open access Oct 2026

Distributed Flexible Assembly Job Shop Scheduling with Collaborative Production and Delivery: Strategy Analysis and a Path-Relinking-Based Solution Method

This paper addresses a collaborative scheduling problem in distributed processing and assembly factories with multiple locations. With the objectives of minimizing the makespan, total tardiness and transportation cost, a distributed flexible assembly job shop scheduling problem with transportation is formulated, and a...

Jing-He Sun, Zhuo Zhang · 0 citations
Open access 2026

A Real-Time Heuristic for Large-Scale Workforce Task Assignment, Multi-Vehicle Routing, and Scheduling With Time-Dependent Profits

A real-time, parallelizable algorithm that assigns and schedules tasks based on their profitability and deadlines, on technician availability, and on skill compatibility, while dynamically adjusting routes and schedules in response to delays or new task requests is provided, preserving service quality under uncertainty...

D. Deplano, C. Seatzu, M. Franceschelli · 0 citations
Open access Oct 2026

Monte Carlo tree search for the multi-crane scheduling problem with temporal constraints

This study addresses the multi-crane scheduling problem with temporal constraints (MCSPTC) arising in steelmaking shops, where multiple rail-guided overhead cranes transport materials on shared tracks and must strictly avoid interference. The problem requires jointly determining task assignment and sequencing decisio...

Woo-Jin Shin, Seungkyu Yoon, Hyun-Jung Kim · 0 citations
Open access Aug 2026

An Adaptive Co-Evolutionary Memetic Algorithm for a Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup and Transportation Times

The hybrid flow shop scheduling problem (HFSP) with unrelated parallel machines (UPMs), sequence-dependent setup times (SDSTs), and inter-stage transportation times has recently emerged as a prominent research topic. To address this scheduling problem with the objective of minimizing the maximum completion time (makesp...

De-Kun Wang, Yue-Chang Lei, Zheng Yuan et al. · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.