This paper investigates hazard assessment and mitigation measures for rainfall-induced debris flow at a highway tunnel portal in Guangdong, China. The tunnel is situated at the outlet of a steep gully with a channel length of 2.38 km, an elevation difference of 682 m, and a gradient of 23.4%. Under extreme rainfall conditions, the portal faces severe risks of scouring and inundation that threaten the structural safety and operational stability of the highway. A high-resolution digital elevation model was established via UAV oblique photogrammetry, and debris flow processes were simulated using HEC-RAS 6.4. The hydrologic behavior under 20-year, 50-year, and 100-year recurrence intervals is first investigated in the research area. After that, the Bingham flow model is used for the debris flow simulation. Results show that as the return period increases from 20 to 100 years, the maximum flow depth at the tunnel portal rises from 1.92 to 2.21 m and the maximum flow velocity rises from 5.8 to 7.8 m/s, indicating that flow velocity is more sensitive to rainfall intensity than flow depth. These simulated flow depths far exceed the 0.5 m flood level stipulated in the Chinese highway tunnel design code, indicating a serious threat to tunnel safety. Based on a quantitative comparison between single-dam and multi-dam schemes, a multi-dam combination with different heights at four positions along the gully is proposed for segmented interception. This multi-dam scheme successfully reduces the flow depth at the tunnel portal to zero without requiring any individual dam to exceed 10 m in height, demonstrating a favorable balance between engineering feasibility and disaster mitigation effectiveness.
Urban flooding in the Sukmajaya area of Cilegon frequently occurs during heavy rainfall, yet the hydraulic interaction between the local drainage network and the Cibeber River has not been comprehensively evaluated. This study aims to assess the hydraulic performance of the existing drainage system under various design...
Debris-flow hazard assessment is essential for identifying the hazard levels of individual gullies and supporting regional disaster prevention and mitigation. Conventional approaches mainly evaluate potential debris-flow magnitude and intensity based on indicators such as catchment area, historical activity, and relati...
Shu-Min Feng, Ke-Ren Dai, Ji-Ming Mei et al.· Remote Sensing· 0 citations
Flood hazard assessment is crucial for effective disaster management and vulnerability zonation, particularly in areas prone to excessive rainfall events. This study integrates the HEC-RAS 2D with the Rain-On-Grid (ROG) technique to simulate rainfall-induced flooding in Abbottabad city and its vicinity. The ROG appro...
Hafiz Muhammed Kashif Mahmood, Mian Sohail Akram· Journal of the Geological So...· 0 citations
Aceh Tamiang Regency is located downstream and has a low-gradient, flat topography, placing it at higher risk of fluvial flooding. Exacerbated by extreme weather events and tropical cyclones, physiographic factors commonly used for mapping often fail to capture and estimate flood magnitude, including floodwater velocit...
Teuku R. S. Pratama, Mutiara Hanny, Geubrina R. Fajria· E3S Web of Conferences· 0 citations
Flooding is one of the most catastrophic natural disasters globally, significantly impacƟngcommuniƟes, infrastructure, and economies. Upper Athi River basin, is one of the river basins inKenya that is under increasing risk of flooding due climate change, rapid urbanizaƟon, andunsustainable land use pracƟces. The objecƟ...
Meschack Ashton, Joram Mochiemo, H. Mwangi· Journal of Agricultural Scie...· 0 citations