Design and Development of Solar-Supported Electric Three-Wheeler Compatible to Bangladesh Perspectives

Sep 2026 · World Electric Vehicle Journal · 0 citations · 11 references

Abstract

The rapid proliferation of battery-driven electric three-wheelers in Bangladesh has substantially increased demand for grid electricity allocated to battery charging, imposing additional strain on the national power grid. While these vehicles offer affordable, low-emission local transportation, their dependence on grid charging remains a growing concern for the country’s energy sector. This paper presents the design, energy-balance analysis, and MATLAB/Simulink simulation of a solar-assisted electric three-wheeler employing a rooftop photovoltaic (PV) panel to supplement battery charging and reduce reliance on conventional grid electricity. The proposed configuration comprises a 48 V, 100 Ah lead-acid battery pack, an 800 W differential motor, a 400 W rooftop PV panel, and a 20 A MPPT charge controller. This constitutes a design-stage, simulation-based study rather than a field-validated evaluation: all runtime, range, and energy figures are theoretical or simulation outputs, cross-checked against a limited, non-randomly sampled set of driver interviews and short spot measurements on comparable in-service vehicles pending prototype construction and instrumented field testing. Simulation results indicate the PV panel can supply 1.0–1.5 kWh/day depending on seasonal irradiance (annual-average: 1.08 kWh/day; best-case, single clear day: 1.5 kWh/day), with the annual-average yield offsetting approximately 25% of simulated annual traction-energy demand (defined as the useful PV energy delivered to the motor as a fraction of annual traction-energy demand, as distinct from gross PV generation). This is expected to reduce battery discharge depth/rate and extend estimated operating time, though these benefits and battery-life effects remain hypotheses pending experimental verification. An indicative techno-economic assessment—incorporating sensitivity analysis on solar yield, tariff, and system cost—suggests payback within roughly 6.5–22 months across explicit optimistic/central/pessimistic scenarios (central estimate ~10 months), with wide uncertainty. The study also provides an order-of-magnitude estimate of potential grid-electricity displacement at scale, excluding onboard battery energy, presenting national vehicle population as an uncertainty range. Results support rooftop solar as a plausible complementary energy source—not replacement—to grid charging, subject to prototype validation.

Read PDF

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.