Skip to content
Open access

Assessing the Extent of Earned Value Management (EVM) Adoption in Institutional Construction Projects

Oct 2026 · Advances in Research · Vol 27, pp. 810-818 · 0 citations

Abstract

Aims: To investigate and determine the extent to which Earned Value Management (EVM), a widely recognised system for monitoring project cost, schedule, and technical performance, is adopted as a                 control tool in institutional construction projects, specifically focusing on the University of Cape Coast, Ghana. Study Design: The study employed an entirely quantitative research strategy coupled with a descriptive research design to objectively measure and accurately describe the usage levels of EVM. Place and Duration of Study: The study was conducted within the institutional context of the University of Cape Coast in Ghana. Primary data collection from the field was carried out over a two-week period. Methodology: The target population comprised well-established D1K1 and D2K2 construction contractors and consultancy firms associated with the university. A purposive sampling technique was applied, utilising Kish's formula to determine the sample size mathematically. Primary data were gathered using structured, self-administered questionnaires. Out of 82 distributed questionnaires, 61 were retrieved, and 55 were deemed complete and suitable for final analysis. The gathered data were coded and analysed using frequencies, percentages, and mean score ranking via SPSS version 20. Results: The findings revealed high theoretical awareness, with 90.90% of respondents indicating that they knew about EVM. However, practical implementation was poor: 18.18% had never used EVM, 40.00% did not use it often, and 5.45% used it very often. Furthermore, EVM applications were found to be highly fragmented. Of the total sample, 45.45% utilised EVM strictly for cost tracking and 36.36% for schedule tracking, while 0% reported using EVM to monitor project scope. Conclusion: Despite widespread theoretical knowledge of fundamental EVM terminologies among top-tier contractors, the overall practical use of EVM in the Ghanaian construction industry remains exceptionally low and fragmented. Contractors fail to translate baseline knowledge into routine practices because of significant operational barriers, notably the time-consuming and highly bureaucratic nature of the system and the lack of a functional framework. It is imperative that strategic systems and functional frameworks are established to streamline processes and improve the comprehensive adoption of EVM.

Read PDF

Similar papers

Open access Nov 2026

Green Project Management and Performance of its Projects in the Telecommunication Companies in Kenya

Purpose: The general objective of this study is to examine the effect of green project management on performance of IT projects in the telecommunication companies in Kenya. This study was guided by the following theories; Resource-Based View (RBV) Theory and Theory of Planned Behavior (TPB). Methodology: This study ad...

Benadate Gesare Okemwa, A. Kyule · 0 citations
Open access 2026

Project Management Practices and SME Performance in Malawi: Evidence from Blantyre and Lilongwe

Small and Medium Enterprises (SMEs) are vital to Malawi’s economy through employment creation, income generation, and economic growth. However, many SMEs face profitability challenges due to managerial, financial, and operational constraints. This study examined the effect of project planning on SME profitability in Bl...

Sidney Bandula, M. Malambo · 0 citations
Open access Nov 2026

Digital Procurement Systems and Performance of State Corporations in Nairobi City County Kenya

Purpose: The study sought to determine the influence of e-tendering platforms and e-invoicing systems on performance of state corporations in Nairobi City County Kenya. This study was anchored by Diffusion of Innovations (DOI) Theory and Resource-Based View (RBV). Methodology: The study employed a descriptive research...

E. Wairimu, E. Wachiuri · 0 citations
Review Nov 2026

Capital Budgeting Techniques Used by SMES and the Role of Cost Data in Project Selection

Small and Medium Enterprises contribute significantly to employment and GDP in Nigeria, yet many fails within their first five years due to poor investment decision making. This study examined capital budgeting techniques used by SMEs and the role of cost data in project selection in South South and South-East Nigeri...

I. Okoroafor · 0 citations
Review Nov 2026

Impact of Strategic Objectives on Business Performance: A Study of Audit Firms in Nairobi County

The audit sector in Kenya is navigating considerable pressure from technological disruption, tightening regulation, and intensifying competition. Many firms in Nairobi County have drawn up formal strategic plans, yet little empirical work has examined the link between specific strategic objectives and measurable busine...

Muriuki Felistus Wakabari · 0 citations
Open access 2026

Efect of Entrepreneurial Strategic Decision Making on Competitiveness of Family-owned Supermarkets in Kenya

The competitive advantage of an entity in a global market is essentially contingent upon the quality of decisions made by its management about development. The escalating complexity, instability, and uncertainty of the environment necessitates enhanced and diverse knowledge. The rationale for this research therefore, w...

Fowzaan Nunow, Wachira Anita, Mwenda K. Lilian · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.