Skip to content
Open access

System Dynamics Modeling for Time and Cost Control in Tukad Badung River Infrastructure

Sep 2026 · Jurnal Ilmiah Telsinas Elektro Sipil dan Teknik Informasi · 0 citations · 31 references

Abstract

Water infrastructure construction in dense urban environments like Tukad Badung, Denpasar, faces severe operational uncertainty due to weather anomalies. Nonlinear interactions between rainfall, machinery productivity, and labor performance frequently cause schedule delays and cost overruns. This study develops a system dynamics model for adaptive time and cost control in river flood infrastructure projects. Using an exploratory sequential mixed-method design, qualitative expert interviews were transformed into Causal Loop Diagrams (CLD) and quantitative Stock and Flow Diagrams (SFD). Model validation against historical progress data yielded a Mean Absolute Percentage Error (MAPE) of 4.85%, supported by dimensional consistency, extreme-condition, and behavior reproduction tests. Baseline simulations under projected 2026 rainfall indicated a 12-day project delay and a 5.2% cost variance. Policy scenario analysis revealed that the "Scheduled Working Hour Optimization" strategy performed best among tested options, achieving timely completion (SPI = 1.00) with a minimal cost variance of 2.1% (final CPI = 0.98). Conversely, reactive workforce addition caused severe cost overruns of 8.0% (final CPI = 0.92) due to site crowding. System dynamics modeling provides project managers with a robust, proactive framework to mitigate climate-induced operational risks in riverine construction environments.

Read PDF

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.