Cycle time minimization for the simple assembly line balancing problem under peak power constraints

Aug 2026 · 0 citations · 22 references
Computer Science

Abstract

Peak power limits restrict concurrent tasks and may increase assembly-line cycle time. To the best of our knowledge, this study is the first to minimize cycle time for the simple assembly line balancing problem type 2 (SALBP-2) with a fixed number of workstations and a fixed limit on total instantaneous power. An exact satisfiability (SAT) method finds feasible schedules, searches systematically for shorter cycles, and proves optimality when possible. Two reproducible formulas define looser and tighter power limits for 72 cases based on the standard SALBP library, with Gurobi and CPLEX providing commercial MIP and CP comparisons. Relative to standard SALBP-2 optima, the two limits increase the best-known cycle time by 16.49% and 61.02% on average. The best-performing SAT configurations find a feasible solution for every case, solve more cases to optimality than each commercial solver, and when both prove optimality, are almost always faster under the reported settings.

View source

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.