Sep 2026· International Journal of Science and Research Archive· Vol 20, pp. 825-830· 0 citations
Abstract
Rapid motorisation and uncoordinated land-use growth along arterial corridors in Port Harcourt, Nigeria, have overloaded many at-grade junctions, including roundabouts originally designed for far lower demand. This study evaluated the operational performance of the five-leg Rumuokoro Roundabout, a key node linking the Choba, Eliozu, Rumuokwota, Rumuaholu and Rumuodomaya corridors. Geometric data (inscribed circle diameter, entry width, entry radius, entry angle, flare length and weaving length) were obtained with a laser distance measurer, while classified traffic volumes, U-turn proportions, heavy-vehicle percentages, gap acceptance, queue lengths and pedestrian crossing demand were recorded using video recording, tally sheets and a digital stopwatch during weekday morning and evening peak periods. Entry speeds were measured with a laser speed gun to obtain the 85th-percentile value. Entry capacity at each leg was estimated using the Kimber empirical regression model, and level of service (LOS) was assigned using Highway Capacity Manual control-delay thresholds adapted for roundabouts. Results showed a substandard inscribed circle diameter (42.3 m), zero flare length, a short weaving length (22–28 m) and an 85th-percentile entry speed of 48 km/h, all outside recommended limits. Volume-to-capacity ratios ranged from 1.31 to 1.79 across the five legs, with control delays between 201 and 312 seconds per vehicle, placing every approach in LOS F (breakdown condition). The Choba and Eliozu approaches, carrying the highest through volumes and heavy-vehicle shares, recorded the longest queues (up to 625 m) and highest delays. The findings indicate that geometric deficiencies rather than volume alone are driving the roundabout's failure, and the paper recommends geometric retrofitting, entry-speed control and a review of the intersection control strategy.
Rapid growth in vehicle ownership and tourist movement has made National Highway 169A, which links Udupi to Shivamogga through the coastal and Malenadu regions of Karnataka, increasingly congested and accident-prone. This study investigates two unsignalized T-intersections on this corridor, Athrady and Hiriyadka, with...
Nirav Nishit· International Journal of Lat...· 0 citations
The proportion of heavy vehicles is one of the factors that can influence the operational performance of arterial road segments, particularly on corridors serving regional movements under heterogeneous traffic conditions. This study analyzes the sensitivity of average speed and average simulated delay to variations in...
Mira Lestira Hariani, Ikhlas Maddinah Pradana, Aidah Kamila et al.· Journal of Green Science and...· 0 citations
Unsignalized intersections may experience declining operational performance as traffic demand increases, resulting in longer vehicle delays, queues, and reduced levels of service. This study aims to evaluate the operational performance of the Mengger unsignalized intersection in Pandeglang Regency using the 2023 Indone...
Muhammad Idang Suryaman, M. O. Mahendra· Journal of Infrastructure Pl...· 0 citations
Increasing traffic demand has become an important factor affecting the operational performance of Bebora Road in Dili City, Timor-Leste. The continuous growth of traffic volume may influence traffic flow characteristics, road capacity, vehicle speed, degree of saturation (DS), and level of service (LOS). This study aim...
J. Guterres, Erminia De Jesusu· International Journal of Eng...· 0 citations
Traffic congestion and pedestrian safety remain critical challenges in Nyarugenge District, one of Kigali's most densely trafficked areas and home to Rwanda's Central Business District (CBD). This study aims to assess the effectiveness and suitability of traffic calming measures and their impact on road safety in Nyaru...
Ntakiyemungu Mathieu, Jacqueline Muhayemariya, Noah Byiringiro et al.· Global Journal of Pure and A...· 0 citations
Bus bunching is usually treated as a service-quality problem: passengers wait longer and crowd into the first of two buses that arrive together. This paper argues that it is also a vehicle-operation problem, because irregular headways translate directly into irregular bus mass, dwell time and fuel use. The argument is...
Ulugbek Xabibulayevich· American Journal of Traffic...· 0 citations
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.