Skip to content
Review Open access

Risk factor identification and ANP-based risk assessment for the traffic-maintaining side during in-situ tunnel expansion

Oct 2026 · Frontiers in Built Environment · 0 citations · 31 references

Abstract

In-situ tunnel expansion is commonly conducted while maintaining existing traffic operation. Under such conditions, the traffic-maintaining side is simultaneously affected by construction disturbance, deterioration of existing structures, complex geological conditions, and operational traffic loads. Its risk sources are characterized by multi-source coupling, chain transmission, and dynamic evolution. To systematically identify and quantitatively assess the risks of the traffic-maintaining side during tunnel expansion, this study analyzes the risk formation mechanism from the perspective of interactions among hazard-inducing factors, risk-bearing bodies, and hazard-formative environments, and proposes four principles for risk identification, namely, systematicity, identifiability, dynamicity, and relevance. Based on literature review, statistical analysis of 35 typical tunnel accident cases, and fishbone diagram analysis, a risk assessment index system is established, including four secondary indicators, namely, existing tunnel factors, environmental factors, geological factors, and design and construction factors, as well as twelve tertiary indicators. ANP is further employed to characterize the engineering dependency relationships among risk indicators and the evaluation-priority feedback relationships between the control layer and the network layer, thereby establishing a risk assessment model for the traffic-maintaining side during tunnel expansion and enabling quantitative evaluation of an engineering case. The results indicate that adverse geological conditions, surrounding rock quality, fault fracture zones, and construction quality are the key risk factors affecting the safety of the traffic-maintaining side. The comprehensive risk score of the project is 2.882, corresponding to a general risk level. The proposed method can provide methodological support for risk identification, hierarchical control, and construction scheme optimization in in situ tunnel expansion projects.

Read PDF

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.