Feasibility Limits in Corridor-Wide EV Fast-Charging Station Planning for Sustainable Transport Electrification: An MILP Study of Puerto Rico’s PR-2

Oct 2026 · Sustainability · 0 citations

Abstract

Planning fast-charging infrastructure for electric vehicles (EVs) supports sustainable transport electrification. This study identifies when a corridor-wide plan along Puerto Rico Highway 2 (PR-2) becomes infeasible and which modeled constraint limits it first. A mixed-integer linear programming (MILP) model with 229 candidate sites across 27 municipalities, integer 150 kW port decisions, a 3 MW per-site ceiling, corridor coverage, and a shared upstream-capacity screen is solved for a February 2024 baseline and six electrification scenarios under an upper-bound demand assumption. The baseline is feasible with 30 stations, 178 ports, and 26.7 MW, whereas all six future scenarios are infeasible. San Juan and Guaynabo, which hold one-third of the island’s registered EV stock but four candidate sites each, exhaust their candidate-set capacity first, at closed-form thresholds of 1.78% and 3.38% electrification, versus 8.99% in the calibrated-2030 case. This threshold reproduces the MILP shortfall to four decimal places in all six infeasible scenarios. At a screening fraction of 0.20, removing the upstream screen changes neither feasibility nor shortfall. Restoring 2030 feasibility would require at least 21 and 11 represented 3 MW sites, versus four each. Under the modeled assumptions, these findings support examining candidate-site limitations before upstream grid reinforcement in sustainable corridor planning.

Read PDF

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.