Oct 2026· Energies· Vol 19, pp. 4937· 0 citations· 24 references
Abstract
Provincial power grids with high wind and photovoltaic penetration face poor out-of-sample security under limited data, whereas robust scheduling can be overly conservative. This study develops an integrated scheduling framework for secure provincial-grid operation using established two-stage Wasserstein distributionally robust optimization. The first stage determines the day-ahead schedule and reserves flexibility. After renewable forecast errors are observed, the second stage adjusts generation, renewable curtailment, reserve deployment, and energy storage charging and discharging. A Wasserstein ambiguity set is constructed from synchronized error samples. The model jointly enforces plant output, ramping, line flow, incremental loss, reserve, and storage state constraints. Dual reformulation and linearization yield a mixed-integer linear program. For the four selected day-specific cases, the estimated reductions in power-shortage frequency relative to sample-based stochastic optimization are 61.24%, 67.39%, 39.01%, and 56.11% in spring, summer, autumn, and winter, respectively. The maximum winter reserve shortfall decreases from 32.69 MW to 5.51 MW, accompanied by lower real-time balancing requirements. Compared with the robust optimization benchmark, the reported schedules and ex post revenue profiles indicate greater revenue opportunities for some renewable generators. These results demonstrate the framework’s potential to balance operational security and renewable generation revenue opportunities in provincial-grid scheduling under limited data.
Modern smart ports combine terminal electrification, shore power, renewable generation, storage, and digital operational control under uncertain vessel traffic and time-varying grid limits. This study develops a simulation-based digital-twin control prototype that synchronizes vessel flow, berth occupancy, equipment ac...
S. R. Samaei, K. S. Reddy, James Riffat· Energy Catalyst· 0 citations
Offshore engineering microgrids integrate renewable generation, energy storage, and large marine test loads. Frequent start-stop transients of test loads, strong wind/PV fluctuations, and saline–humid conditions accelerate equipment aging and threaten power quality, while conventional dispatch neglects battery degradat...
Xiang-Yu Gu, Nan Hu, Lei Zhang et al.· Energies· 0 citations
High-renewable virtual power plants (VPPs) exhibit asymmetric operational risks stemming from net-load forecast errors: positive errors require upward reserve capacity, while negative errors can cause grid export saturation and renewable curtailment. This paper proposes RC-CVaR-H2, a linear rolling-horizon framework co...
Wei Cheng, Na Li, Lei-Lei Wang et al.· Energies· 0 citations
With the increasing penetration of renewable energy, fluctuations of non-AGC renewable stations and load disturbances may cause security-boundary violations in multi-level transmission sections. This paper proposes a seconds-scale renewable AGC security-control method that integrates DNN-based fast state estimation, PT...
Guo-Fang Zhang, Li-Tang Xi, Jing Zhao et al.· Frontiers in Energy Research· 0 citations
Restoring a bulk power system after a blackout involves black start, network reconfiguration and load restoration, usually optimized in sequence; renewable stations used as early sources add an output uncertainty that the schedule must anticipate. This paper formulates the three stages jointly for systems with photovol...