Workload Analysis to Determine Mechanical Workforce Requirements (Fulltime Equivalents) in Mining Projects: A Case Study of PT TMP

Aug 2026 · Journal of social research · Vol 5, pp. 4405-4417 · 0 citations · 19 references

Abstract

The mining industry requires an optimal mechanical workforce to ensure equipment reliability, operational efficiency, and sustainable productivity. However, workforce allocation is often determined using conventional approaches that may not adequately reflect actual workload variations, resulting in potential overstaffing or understaffing. This study aimed to determine the optimal number of mechanical personnel required in the Asset Management Group (AMG) Department of PT TMP by applying the Full-Time Equivalent (FTE) method and integrating the results with Key Performance Indicators (KPIs), the Balanced Scorecard (BSC), Strategic Workforce Planning (SWP), and expert judgment. A quantitative descriptive approach was employed using historical maintenance data collected from April to December 2025, including work orders, maintenance duration, manpower requirements, and effective working hours. The workload was converted into FTE values, validated through expert judgment, and subsequently evaluated against departmental performance indicators. The findings revealed that the average ideal workforce requirement was 21.8 mechanics, with a peak demand of 39 mechanics, while the actual workforce averaged 37.9 mechanics. Nevertheless, expert validation recommended maintaining a workforce level of 45–48 mechanics as a strategic manpower buffer to accommodate operational uncertainties during the project transition period. Integration with KPIs demonstrated improvements in Physical Availability (98.6%), Mean Time Between Stoppages (118.3 hours), Mean Time to Repair (3.2 hours), and Manpower Cost per Hour (USD 5.66). The study concluded that integrating FTE analysis with performance management and strategic workforce planning provided a comprehensive, evidence-based framework for optimizing workforce allocation and supporting long-term operational sustainability in mining projects.

Read PDF

Similar papers

Aug 2026

Improving maintenance reliability: human-centric strategies for knowledge management and task assignment

This study aims to improve maintenance reliability by strategically allocating the workforce, considering human factors and knowledge management in critical asset maintenance within the public transport sector. The study proposes a quantitative-applied approach integrating multi-criteria decision-making (MCD...

Cristian García García, Mary Josefina Vergara Paredes, Javier Cárcel-Carrasco et al. · 0 citations
Open access Aug 2026

Factors affecting workforce productivity in road construction projects: A statistical analysis from Nepal

The purpose of this study is to investigate the key factors affecting labor productivity in road construction projects and to identify strategies for improving workforce performance in the construction industry. A mixed-methods research approach was adopted, integrating quantitative and qualitative analyses. Primary da...

B. Lamichhane, Om Prakash Giri, Anup Chhimal · 0 citations
Open access Aug 2026

Implementing Warehouse Management to Improve Inventory productivity in the execution of projects in a Construction Company, Lima 2025

Warehouse management plays a decisive role in the competitiveness of construction companies, where the timely availability of materials and equipment conditions project progress. Aligned with Sustainable Development Goal 9, this research aimed to determine how the implementation of warehouse management improves product...

Junior Smith Saavedra Machare, José Pablo Rivera Rodríguez · 0 citations
Open access 2026

Evaluating Warehouse Management System (WMS) and Inventory Efficiency: Evidence from the Malaysian Automotive Industry

The increasing complexity of operations in the automotive industry has created a strong demand for effective inventory management to ensure operational efficiency and customer satisfaction. Warehouse Management Systems (WMS) are widely used to support inventory control, improve data accuracy, and enhance decision-makin...

Yusri Arshad, Nur Atika Ayunni Mohammad Ali, Sharifah Norhafiza Syed Ibrahim et al. · 0 citations
Open access Sep 2026

Improving Manpower Utilization Through Work-Study and Lean Techniques: A Case of Manual Assembly

Despite technological advances, many manufacturing industries continue to rely on manual assembly lines. However, manual assembly lines often experience situations of underutilized manpower due to inefficient workload distribution and suboptimal work methods. The ability to optimize manpower utilization in labour-inten...

Nethmi Abesinghe, Kumuduni Hennayaka, Ayesha Malshani et al. · 1 citation

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.