INTEGRATED COST-SCHEDULE AND PROCUREMENT ANALYTICS FOR CONSTRUCTION SUPPLY CHAINS IN SAUDI MEGA-PROJECTS: ENHANCING FORECASTING AND PROJECT DELIVERY UNDER VISION 2030
Oct 2026· International Journal of Advanced Research· Vol 14, pp. 88-98· 0 citations
Abstract
Saudi mega-projects operate through dense networks of designers, contractors, manufacturers, logistics providers and specialist suppliers, so cost and schedule performance cannot be governed effectively as separate reporting streams. Procurement commitments shape the timing and price of resources; schedule changes alter purchasing priorities and logistics demand; and commercial variations feed back into forecast completion cost. This review develops an integrated framework for cost-schedule and procurement analytics in construction supply chains, with particular relevance to Saudi Arabias Vision 2030 delivery environment. Thirty peer-reviewed studies published from 2020 to 2025 were synthesised across artificial intelligence in construction management, project cost prediction, schedule forecasting, construction supply-chain modelling, resilience and digital-twin-enabled control. The evidence indicates that predictive value emerges when cost, schedule and procurement records share consistent identifiers, timestamps and decision horizons. Machine-learning and hybrid models can improve forecasting, but isolated accuracy is insufficient unless outputs expose uncertainty, identify drivers and trigger accountable management action.
Saudi Arabia’s giga-project portfolio concentrates exceptional capital, schedule pressure, supplier interdependence and exposure to volatile markets within programmes expected to deliver strategic outcomes under Vision 2030. Conventional cost control and procurement reporting are necessary but often backward-looking: t...
Amaan Ullah Sharif Mohammed· Iconic research and engineer...· 0 citations
Saudi Arabia’s giga-project programme brings together major capital investment, numerous interfaces, multiple contractors, imported materials, off-site production, and regulatory dependencies within compressed delivery periods. As a result, conventional project-control and construction supply-chain practices lose effec...
M. Shebin· Global academic journal of e...· 0 citations
Unprecedented construction activity, tight delivery windows, complex interfaces, global sourcing, and exposure to volatile material markets characterize Saudi Arabia’s giga-project portfolio. These conditions make procurement, cost control, and schedule performance highly interrelated. This review critically discusses...
M. Shebin· Iconic research and engineer...· 0 citations
Cost escalation in megaprojects is frequently recorded as a project-controls problem although a material proportion of its antecedents originates outside the conventional cost ledger: in supplier capacity, procurement decisions, fabrication readiness, delivery uncertainty and poorly sequenced site work. This integrativ...
Samhar Samoon· Iconic research and engineer...· 0 citations
Offshore engineering, procurement, construction, and installation projects depend on long-lead equipment, constrained marine access, port availability, and sequential construction interfaces. These dependencies make project delivery highly sensitive to geopolitical uncertainty, market volatility, route disruption, po...
Ganesh Reddimi, Ahmed Marei Al Radhi, R. N. Alzaabi et al.· ADIPEC· 0 citations
The increasing complexity of high-variant manufacturing challenges the static planning assumptions of traditional supply chains. Industries like architectural lighting operate with extensive customization, global networks, prolonged replenishment cycles, and diverse service expectations. Assigning static lead times and...
Saimanikandan (Sai) Ramesh· World Journal of Advanced Re...· 0 citations