From Real-Time Integrated Formation Evaluation and Geosteering to ICD Optimization: A Case Study for Sustained Oil Production in a Mature Offshore Carbonate Field
Abstract
This paper presents an integrated formation evaluation workflow developed to drill and complete horizontal producer Well X in a mature offshore carbonate field in Abu Dhabi. Historical dump flooding within the oil pool, followed by decades of peripheral water injection and later crestal gas injection, has resulted in complex fluid distributions within the reservoir, characterized by localized gas-cap expansion and irregular injected-water distribution. Several offset producers near Well X experienced unexpected rapid increases in water cut and subsequent loss of natural flow, highlighting the challenges associated with accurately predicting fluid distribution. To mitigate the risk of premature water breakthrough, a pilot hole was drilled prior to the horizontal section of Well X. In addition, this well incorporated advanced data acquisition technologies, including Logging-While-Drilling (LWD) triple-combo, Ultra-Deep Azimuthal Resistivity (UDAR), Formation Testing While Drilling (FTWD), and Advanced Mud Logging (AML). The acquired data were integrated in real time to evaluate fluid distribution and optimize geosteering decisions during drilling. Pilot-hole LWD data showed no water indication within the proposed landing interval in the upper part of Sub-layer 2 and indicated gas influence near the top of Sub-layer 3. The gas indication was observed again from LWD and AML data while drilling the horizontal landing section. Based on these results, the horizontal drain was landed within the oil-bearing zone of Sub-layer 2. However, although pilot-hole evaluation suggested oil-bearing conditions within the proposed landing interval, conventional propagation resistivity and UDAR identified a conductive interval within Sub-layer 2 approximately 1,200 ft from the reservoir entry. The historical injector distribution, high-water-cut behavior observed in nearby producers, and the absence of any significant porosity or lithological change supported the interpretation that the interval represented slumped injected water. Following several hundred feet of further evaluation, the well trajectory was adjusted upward by approximately 12 ft TVD into the oil-bearing portion of Sub-layer 3. The adjustment repositioned the wellbore away from the interpreted water-affected interval and established an estimated TVD separation of 6 to 7 ft from the conductive interval remaining within Sub-layer 2, while staying below the gas-affected upper part of Sub-layer 3. The lower-completion design was subsequently revised from the planned conventional Limited-Entry Liner (LEL) to a NETool-modeled 10-compartment ICD completion. High, Medium, and Low relative nozzle restrictions were assigned based on the interpreted reservoir risk profile along the wellbore and installed nozzle geometry. The design was intended to limit excessive compartment inflow, moderate localized reservoir drawdown, and lower water-coning risk while maintaining deliverability from lower-risk intervals. The resulting well placement and completion design were followed by sustained production performance, with 0% measured surface water cut over more than two years of monitoring.