AN ECONOMIC-MATHEMATICAL MODEL FOR REPAIR WORK PRIORITIZATION AND BUDGET OPTIMIZATION IN RESIDENTIAL COMPLEXES
Abstract
The article investigates a topical scientific and practical problem of rationalizing the allocation of limited financial resources by associations of co-owners of apartment buildings (ACABs) and property management companies when planning and carrying out restoration works in residential complexes. The need for a formalized approach to repair work prioritization is substantiated, as relying solely on the chronological order in which requests are received fails to account simultaneously for their urgency, technical criticality, potential economic losses resulting from delays, and the scale of their impact on residents. To formalize managerial decision-making regarding the allocation of limited financial resources, an economic-mathematical model for the comprehensive prioritization of repair works in residential complexes has been developed. The proposed approach integrates a four-dimensional evaluation framework—comprising work urgency, the technical criticality of the damaged element, the scale of the impact on residents, and potential economic losses resulting from delays— with a discrete optimization problem of the 0–1 Knapsack Problem type. Heterogeneous factors are aggregated using a linear weighted sum with normalized weighting coefficients, enabling the calculation of a unified composite priority index for each repair operation. The applicability of the proposed model is demonstrated through a computational experiment using a dataset of 10 diverse repair requests under a predefined budget constraint. Comparative analysis showed that, for the set of requests examined, the optimization model increases the aggregate composite priority of the funded portfolio by approximately 23.4% and improves utilization of the available budget from 90.0% to 94.0% compared with baseline heuristic approaches. Within the computational experiment, the structural reallocation of resources enabled the inclusion in the funded portfolio of repair works with high values for the potential economic loss criterion. This creates conditions for reducing the risk of secondary damage and the associated additional costs, while providing a basis for supporting managerial decision-making by residential complex administrations.