Real-Time Production Forecasting Using GSS-Optimized Holt DES: An Empirical Comparison with ARIMA

Oct 2026 · Jurnal Teknoif Teknik Informatika Institut Teknologi Padang · 0 citations · 23 references

TL;DR

An online point-of-sale system featuring automated predictions for production duration and assessed its forecasting precision and computational efficacy in comparison to a statistical standard revealed a compromise between predictive precision and computational efficacy in production scheduling.

Abstract

Kurnia Plastic Factory depended on manual documentation of transactions and production scheduling, leading to postponed reporting, erroneous completion projections, and inadequate decision-making. This research created an online point-of-sale system featuring automated predictions for production duration and assessed its forecasting precision and computational efficacy in comparison to a statistical standard. The system was constructed utilizing the Extreme Programming style, the Laravel framework, PHP, and MySQL. Holt Double Exponential Smoothing technique was refined through the application of the golden section search algorithm. Functional testing verified that all 19 features functioned as intended, whereas user acceptance testing attained a success percentage of 94.74%. The assessment of forecasting efficacy was conducted by rolling one-step-ahead projections utilizing 255 observations of production duration documented from 2023 to 2025. The autoregressive integrated moving average model with parameters of one, one, and one surpassed the optimum smoothing technique in all accuracy measures, recording a mean squared error of 1.69, a mean absolute error of 1.05, and a mean absolute percentage error of 34.99%. The refined smoothing technique necessitated an average processing duration of 2.36 milliseconds, in contrast to 35.77 milliseconds for the fixed-order statistical model. The prediction endpoint yielded a response time of about 154.20 milliseconds. The smoothing technique was preserved due to its automatic parameter adjustments for each request, resulting in reduced processing expenses, even though it exhibited diminished forecasting precision. These results revealed a compromise between predictive precision and computational efficacy in production scheduling.

Read PDF

Similar papers

Conference Oct 2026

A multimodel fusion and Bayesian optimization framework for complex demand forecasting

Based on the complex and ever-changing market demands of Wanda Group, a big data demand forecasting framework for actual operations was constructed by using enterprise historical sales records and business data such as prices, promotional marks, and seasonal indices. At the model level, three methods including ARIMA(2,...

Teng-Jian Liu, Jia-Nan Chen, Shu-Ting Yang · 0 citations
Open access Sep 2026

A data-driven decision-support framework for predictive quality management in FMCG manufacturing

Quality management in high-volume manufacturing increasingly requires data-driven approaches that complement conventional retrospective analysis. This study developed a retrospective decision-support framework for FMCG biscuit manufacturing by integrating Six Sigma DMAIC with regression modelling, time-series forecasti...

S. Hakim, Galuh Zuhria Kautzar, Andy Hardianto et al. · 0 citations
Open access Sep 2026

Dynamic Loss Rate Prediction for Production Materials Based on AHP-Gray Markov

Accurately predicting the material loss rate is critical for MRP-driven delivery and inventory control. Inaccurate and delayed data acquisition leads to imprecise master data and poor knowledge of how machines are used in small- and medium-sized manufacturing enterprises (SMEs), but dynamic production environments and...

Hai-Jun Ma, Cheng-Liang Liu, Xin Wang · 0 citations
Open access Nov 2026

Rapid Pre-construction Forecasting of Schedule Overruns: A Machine Learning Regression Approach

This study developed and validated a parsimonious machine-learning regression model that estimates schedule overruns for building construction projects prior to project start. Using a dataset of 60 completed building projects in Lebanon, each with 11 pre-project predictors, an XGBoost regression model was tr...

C. A. Shdid, R. Awwad, Joshua Nasr · 0 citations
Open access 2026

FORECASTING OVERALL EQUIPMENT EFFICIENCY IN ELECTRONIC INDUSTRY USING INDUSTRIAL INTERNET OF THINGS AND MACHINE LEARNING METHODS

Background. The article considers modern methods for forecasting the overall efficiency of equipment, allowing to identify productivity reserves and manage production losses at industrial enterprises in the context of digitalization and the implementation of IIoT systems. The relevance of using machine learning algorit...

Vitaly R. Aleksandrov, Aleksey A. Shchetkin, Aleksandr S. Bevz et al. · 0 citations
Open access Oct 2026

Simulation-Trained Explainable Policy Selection for Dynamic Production Scheduling in Manufacturing SMEs: An End-to-End Diagnostic Evaluation

Predictive accuracy and explanatory fidelity do not guarantee scheduling benefit and support end-to-end validation of simulation-trained decision policies, and mixed DES validation results should be interpreted as diagnostic simulation evidence rather than direct field-performance forecasts.

J. Rodríguez-Flores, Alexander Sánchez-Rodríguez, R. Pérez-Campdesuñer et al. · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.