The conceptual model for risk-oriented management of e-commerce IT platform development and implementation
Abstract
This study examines how risk management and managerial decision-making coordinate when developing and implementing information technology (IT) platforms for electronic commerce. It aims to develop a conceptual model that defines the relationships between processes, risks, indicators, stakeholders and managerial actions. The research uses an analysis of scientific publications, conceptual modelling and a set-theoretic representation of the model’s components and relationships. An illustrative payment service integration scenario and a qualitative strengths, weaknesses, opportunities and threats (SWOT) analysis assess its applicability. The model integrates information and analytical, controlling and controlled subsystems. Its design follows the principles of continuous risk management, decision traceability, accountability and feedback. It defines inputs, outputs, interaction with the supersystem and external environment, and feedback for reviewing risks and response measures. The scientific contribution is a structural representation of the management system. It links each risk to the relevant process, an indicator of potential consequences, a response option and a responsible stakeholder. The study defines requirements for decision preparation, including constraint checks, specification of the expected outcome, and selection of a suitable verification method. A company can apply the model while retaining decision history and transferring responsibility between life cycle stages. The scenario shows how decision-makers can account for unverified interaction conditions with a payment service before launch. It distinguishes correcting an identified defect from reassessing the risk of subsequent failures. The SWOT analysis identifies the model’s strengths and limitations, as well as the opportunities and threats associated with its application. The model defines a structure of linked records on processes, risks and response measures for use in existing task management and monitoring tools. The results support developing risk assessment methods and selecting managerial actions. The scenario demonstrates practical application, while effects on project schedules and losses require validation using project data.