Skip to content
Book Open access

A Late Acceptance Hill-Climbing Algorithm for Flexible Job Shop Scheduling Problems with Worker Flexibility

Jul 2026 · GECCO Companion · pp. 1-2 · 0 citations · 4 references
Computer Science

TL;DR

Experimental results demonstrate that the proposed LAHC approach is a promising algorithm to address the FJSSP-W, and explores a neighborhood structure comprising machine and worker reassignments, as well as job-sequence permutations.

Abstract

The Flexible Job Shop Scheduling Problem with Worker constraints (FJSSP-W) is a challenging optimization problem that simultaneously coordinates machine assignment, worker allocation, and operation sequencing. This paper proposes a Late Acceptance Hill Climbing (LAHC) metaheuristic to address the FJSSP-W. LAHC uses a single-state trajectory with a history-based acceptance criterion, enabling straightforward parameter tuning and interpretation. Our implementation explores a neighborhood structure comprising machine and worker reassignments, as well as job-sequence permutations, while using a secondary objective of workload balance to break ties in makespan values. Experimental results on the competition's benchmark demonstrate that the proposed LAHC approach is a promising algorithm to address the problem.

Read PDF

Similar papers

Preprint Jul 2026

Novel Iterative Construction Methods for the Blocking Job Shop Scheduling Problem

Three new beam-search-based heuristics are proposed: the Beam Search Iterative Construction Heuristic (BS-ICH), its CPU-parallel extension Parallel Multi-Strategy Beam Search (PMS-BS), and a GPU-accelerated variants G-PMS-BS.

A. Dabah, Karima Rihane, Hocine Saadi et al. · 0 citations
Open access 2026

A bi-level algorithmic framework for the multi-objective flexible job shop scheduling problem

These findings demonstrate the effectiveness and adaptability of the proposed framework for energy-aware flexible job shop scheduling and show that the BLDMA framework achieves better non-dominated solution sets on the tested instances.

Jia-Yu Liu, Juin-Han Chen, Hai-Yang Liu et al. · 0 citations
Conference Open access 2026

Job Shop Scheduling Problem Based on an Improved Genetic Algorithm

Experimental results show that the improved algorithm achieves an optimal Makespan value of 190 in dynamic disturbance scenarios and exhibits strong robustness, providing an efficient and feasible solution for job shop scheduling in complex production environments.

Jianguo Du, Chengkun Li, Zijie Tang · 0 citations
Open access Aug 2026

An Adaptive Co-Evolutionary Memetic Algorithm for a Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup and Transportation Times

The hybrid flow shop scheduling problem (HFSP) with unrelated parallel machines (UPMs), sequence-dependent setup times (SDSTs), and inter-stage transportation times has recently emerged as a prominent research topic. To address this scheduling problem with the objective of minimizing the maximum completion time (makesp...

De-Kun Wang, Yue-Chang Lei, Zheng Yuan et al. · 0 citations
Preprint Sep 2026

Minimizing the makespan in job shop scheduling under conflict graph constraints

This work establishes a polynomial equivalence between JSC and a variant of the resource-constrained job shop problem with unit-capacity resources and proposes a genetic algorithm using permutation-with-repetition encoding and active, non-delay, and hybrid schedule evaluation procedures.

Nour ElHouda Tellache, Abdenour Azerine · 0 citations
Open access 2026

Green Flexible Job Shop Scheduling Using Genetic Algorithms with Adaptive Neighborhood Search

A Adaptive Genetic Algorithm (AGA) is designed to solve the Multi-Objective Flexible Job Shop Green Scheduling Problem (MO-FJGSP), which aims to minimize the makespan, total energy consumption, and total carbon emissions.

Ming-Yue Li, Li-Na Wang, Jun Wang et al. · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.