Skip to content
Review

Maximizing Offshore Mature Wells Production via Acid Blend Optimization: Field-Proven Results in Gulf of Suez (GUPCO), Egypt

Sep 2026 · GOTECH · 0 citations

Abstract

To enhance well accessibility and productivity, tubing cleaning and acid stimulation treatments were conducted in our mature offshore field. The chemical formulation was optimized through the selection of targeted additives and adjustment of their concentrations, resulting in superior performance compared to conventional acid blends. Laboratory and field results demonstrated high treatment efficiency with no detrimental impact on the reservoir formation. This success enabled the broader application of the optimized design, offering a reliable alternative to traditional stimulation approaches. Several wells in our field have experienced scale buildup within the completion string, including hard scale deposits that are particularly resistant to removal. In many cases, mixed scale compositions further complicate treatment, necessitating specialized chemical solutions. Conventional chemical treatments proved ineffective in restoring well performance. Following a comprehensive study, a newly formulated chemical design was developed and deployed using a rig-less bullheading approach. This method demonstrated significant impact in restoring and increasing well productivity. Detailed chemical selection criteria, treatment design, and field performance data are presented to support the dissemination of best practices and operational excellence. This study presents different successful field case studies demonstrating the effectiveness of optimized chemical treatments in scale remediation. Case 1: Scale precipitation at high depth obstructed well intervention. Initial acid treatment failed to clean the tubing. A comprehensive review of well conditions and acid formulation led to the recommendation of a modified treatment. This adjustment successfully restored full well access and resulted in a measurable increase in oil production. Case 2: A HPHT, clastic reservoir well was obstructed by a wireline fish and significant scale buildup mainly zinc sulfide. Initial acid stimulation partially restored production. Subsequent analysis led to modifications in the acid blend, which improved treatment performance. Further optimization enhanced cleaning efficiency and sustained production over an extended period. Another case: The well experienced a gradual decline in production before stabilizing. Scale analysis indicated elevated chloride content. Tubing cleaning with fresh water increased the WHT to 115 °F. Despite the well's critical nature, characterized by high oil rate, reservoir temperature of 320 °F, and clay presence; a near-wellbore cleaning was executed using a specially formulated acid system. This intervention yielded the best performance in years, raising WHT from 110 °F to 165 °F and achieving a production gain of 1400 BOPD (200% increase).

View source

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.