TL;DR
The reviewed studies indicate that BIM-AI workflows may improve planning efficiency, estimation accuracy, and resource allocation, but still faces challenges related to software interoperability, data quality, interdisciplinary coordination, and the limited integration of explicit sustainability indicators within optimisation models.
Abstract
The increasing complexity of construction projects has made traditional planning methods inadequate for managing dynamic variables. In this context, the integration of building information modelling (BIM) and artificial intelligence (AI) has been increasingly investigated as a promising approach to improve estimation accuracy, decision-making, and sustainable project execution. This systematic literature review, conducted according to the PRISMA guidelines, analysed 47 articles on BIM-AI integration for construction cost and time planning, categorising them into three clusters: time-oriented, cost-oriented, and multi-objective planning. The reviewed studies indicate that BIM-AI workflows may improve planning efficiency, estimation accuracy, and resource allocation. A limited subset of studies directly incorporated energy consumption, carbon emissions, or lifecycle performance into the optimisation objectives. By contrast, broader benefits related to material waste, rework, equipment idle time, and safety were mainly inferred from improvements in scheduling and resource management rather than directly quantified across the reviewed studies. Artificial Neural Networks (ANNs) and Genetic Algorithms (GAs) emerged as the most frequently adopted and consistently reported techniques, while Revit was the most adopted BIM platform. Despite its potential, BIM-AI integration still faces challenges related to software interoperability, data quality, interdisciplinary coordination, and the limited integration of explicit sustainability indicators within optimisation models. Future research should focus on developing standardised and adaptable frameworks that jointly address cost, time, resource efficiency, environmental impact, and lifecycle performance across different construction contexts.
A hybrid MILP-NSGA-II optimization model is employed to reduce the project cost, the time taken to complete, and the total risk to aid decision-making and the results of the experiment show a high level of predictive performance.
Rui-Xin Li, Reem A. Almenweer, Haytham F. Isleem et al.· Scientific Reports· 0 citations
Life Cycle Assessment (LCA), as a powerful environmental management tool, is important for the construction of sustainable built environments. Due to its comprehensive, integrated, and systematic structure, application and process optimization have become increasingly important for LCA, and Building Information Modelin...
The construction industry is a major contributor to global resource consumption and environmental degradation, highlighting the need for effective management-oriented approaches to sustainability. Although previous studies have mostly focused on green building technologies and evaluation instruments, an increasing tren...
Xue Bai· Journal of Environmental &am...· 0 citations
The convergence of Artificial Intelligence (AI) and Building Information Modeling (BIM) is reshaping how the Architecture, Engineering, and Construction (AEC) sector manages projects across their lifecycle, yet the systemic uptake of this convergence remains poorly understood in developing-economy contexts such as Moro...
A BIM-integrated Digital Inspection and Testing System to improve construction quality management through the integration of Building Information Modelling, Novade, and business intelligence platforms, which has the potential to reduce documentation redundancy, improve quality traceability, minimize rework, and strengt...
Hanafi bin Ab. Haris, Norhazren Izatie Mohd, Hamizah Liyana Tajul Ariffin et al.· International journal of res...· 0 citations
Industrial construction projects involve complex interactions among uncertainty, risk, schedule, and cost, motivating the development of advanced analytical and decision-support methodologies. This study systematically reviews methodological approaches to risk assessment and performance management in industrial constru...
Cemil Turan, Maksat Kalybek, Aigul Zhasmukhambetova et al.· Mathematics· 0 citations