FLUXO DE TRABALHO PARA INTEGRAÇÃO DO PLANEJAMENTO E ORÇAMENTO E SIMULAÇÃO DE PRAZO E CUSTO EM BIM NA PRODUÇÃO DE ALVENARIA

Oct 2026 · Revista Científica Semana Acadêmica · 0 citations

Abstract

The current scenario of technological, digital, and organizational innovation has driven the application of Building Information Modeling (BIM) as a tool for integrating different design disciplines with project schedule and cost parameters. Despite advances in its adoption, there is still a lack of guidelines for designing virtual models based on construction planning and budgeting premises, which compromises the efficient use of this information throughout the design process. Although available digital tools and software enable data synchronization, modeling procedures involving different platforms still require further detailing and systematization. In this context, this research proposes a workflow to support the synchronization of schedule and cost parameters within a BIM model applied to the masonry production process, as well as the simulation of construction variables. The methodology adopted was Design Science Research (DSR), with Case Study as the research strategy. The results validated the proposed workflow, demonstrating its contribution to systematizing the synchronization of schedule and cost parameters during the design phase of projects. Therefore, it can be concluded that the proposed objectives were achieved.

Read PDF

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.