Unified Transient Gas-Liquid Flow Model for Simultaneous Influx-Loss and Safe MPD Drilling Time Evaluation in Fractured Carbonate Wells
Abstract
Fractured-vuggy carbonate reservoirs feature strong heterogeneity, and multiple pressure systems are commonly developed vertically. Gas influx and drilling fluid loss may occur simultaneously during drilling operations, significantly complicating wellbore pressure response, surface influx-loss characterization and pressure control operation. To quantitatively describe this type of working condition, this paper establishes a one-dimensional transient gas-liquid two-phase drift flux model applicable to multiple influx points and multiple loss points. Dynamic gas influx and loss source terms are introduced into the mass conservation equations of gas phase and liquid phase respectively, and the model is coupled with wellbore momentum equation, fluid temperature-pressure physical property model and surface choke boundary to calculate wellbore pressure, gas holdup, casing pressure, pit volume and gas migration process. Validation with field logging data shows that the average relative errors of the model for pit volume, casing pressure and gas arrival time at the wellhead are 1.62%, 3.31% and 3.21%, respectively. Under the condition of consistent pressure difference between influx and loss, the overall pressure response of three working conditions, namely influx in the upper interval with loss in the lower interval, loss in the upper interval with influx in the lower interval, and coexistence of influx and loss in the same interval, is similar. The pressure difference of source terms is the main factor controlling the flow state, while the position variation of influx and loss points within 400 m has limited influence. Reducing flow rate can slow down gas upward migration and casing pressure growth, but it also reduces bottomhole pressure; decreasing choke opening can compensate bottomhole pressure, but it restricts outlet flow rate. Therefore, adjusting a single parameter can hardly balance bottomhole pressure and safe MPD drilling time. Calculation of a case well shows that on the premise of meeting the critical flow rate for cuttings carrying, jointly adjusting choke opening and drilling fluid flow rate can extend the safe MPD drilling time from 61 min to 71 min, an increase of 16.4%. This model can provide a calculation basis for the identification of simultaneous influx and loss, casing pressure early warning and pressure control parameter optimization in fractured carbonate gas wells. This study provides a transient-modeling contribution by establishing a unified framework for simultaneous influx and loss during MPD, which enables quantitative evaluation of safe MPD drilling time under complex downhole conditions.