Oct 2026· Journal of Energy Engineering· Vol 152· 0 citations· 11 references
Abstract
With the growing integration of distributed energy resources and the increasing operational complexity of modern distribution networks, ensuring high reliability and maintaining voltage stability during fault recovery have become critical challenges for utilities. To address these challenges, this paper proposes a novel optimization framework for the coordinated planning of sectionalizing switches, tie lines, and mobile energy storage systems (MESSs). The framework employs a bilevel optimization model to achieve coordinated asset placement and operational scheduling. Specifically, the upper-level model aims to achieve a balanced trade-off between economic investment and reliability performance by minimizing both the installation costs and the outage penalties quantified by the expected energy not supplied (EENS). To efficiently solve the upper-level multiobjective problem, an improved multiobjective gold rush optimizer is employed, generating the Pareto-optimal planning solutions. During the iterative optimization process, an enhanced fault incidence matrix–based reliability assessment method is integrated, in which the contribution of MESSs is quantified through a sparse matrix
R
dis
derived from the lower-level operational model, enabling more accurate analytical evaluation. Complementarily, the lower-level model focuses on operational quality during fault recovery by optimizing MESS dispatch using a mixed-integer second-order cone programming formulation. This model minimizes voltage deviations at isolated load nodes, thereby ensuring stable and effective power supply restoration. Additionally, the ZIP load model is also embedded to precisely capture load reduction behavior under fault conditions, enabling a more realistic evaluation of energy curtailment. Case studies conducted on a 41-node distribution network demonstrate that the proposed bilevel optimization approach effectively reduces EENS by up to 21% and reduces the number of unqualified voltage nodes with a moderate investment increase, highlighting the importance of the proposed method.
The rapid increase in deployment of Distributed Energy Resources (DERs) is transforming traditional passive distribution networks into active and intelligent power systems capable of meeting the objectives of the sustainable energy transition. However, identifying appropriate locations and capacities for DER installati...
A. Shrivastav, Sibom Indra, Suparna Pal et al.· Scientific Reports· 0 citations
This paper introduces a numerical optimization model (mixed-integer) of reliability-based design of energy storage systems (ESS) in the highrenewable-based power grid. This is done by developing a mixed-integer nonlinear programming (MINLP) model that incorporates probabilistic reliability indices (Loss of Load Probabi...
M. Kaman, H. Khan, T. Ma et al.· Revista Internacional de Mét...· 0 citations
The quality of electricity supply in distribution networks is critically dependent on minimizing active power losses and ensuring voltage stability. This study proposes a unified multi-objective optimization approach for the simultaneous placement and sizing of a photovoltaic (PV) source and a static var compensator (S...
H. Ibrahim, A. Issaka, Moussa Gonda et al.· International Journal of App...· 0 citations
The modern power distribution systems face many challenges due to the increasing electricity demand, urbanization, industrial growth and the incorporating renewable energy sources like wind and solar power. The traditional radial distribution systems suffer from problems like high power losses, poor voltage profile, fe...
S. Reddy, M. Natarajan, M. Saiveerraju· International journal of com...· 0 citations
Distribution network reconfiguration is a key strategy for achieving a secure, reliable, and economically efficient electricity supply. This paper proposes an optimization-based reliability enhancement framework for distribution systems through network reconfiguration and distributed generation (DG) integration using a...
Khaliq Ahmed, M. Sinha, Piyush Chouhan· International Journal of Rel...· 0 citations
: With the large-scale integration of stochastic distributed resources, the power-flow distribution, fault restoration mode, and renewable energy accommodation boundary of distribution networks have changed significantly. Conventional reliability assessment methods are mainly based on component-level fault enumeration,...
Q. Luo, Xiang-Tian Hou, Ziqing Yang et al.· Energy Engineering· 0 citations
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.