Skip to content
Review

Unlocking Remaining Oil in Low-Permeability Carbonates Through Horizontal Sidetracking: An Integrated Reservoir-To-Drilling Pilot in the Middle East

Nov 2026 · ADIPEC · 0 citations · 2 references

Abstract

Carbonate reservoirs commonly leave significant unflooded oil due to incompltet well patterns, while further waterflood intensification can be constrained by injector wellhead pressure and surface-facility limits. Reservoir M, whose permeability is low, in A Oilfield is developed mainly by horizontal-well linear waterflooding. After six years of injection, reservoir pressure recovered to 3,600 psi, or 81% of the initial pressure, with field oil production of 59,800 bbl/d, water cut of 28.48% and cumulative voidage replacement ratio of 0.698. However, low injectivity forced horizontal injectors to operate close to fracture and facility pressure limits, creating a conflict between pressure maintenance and safe operation. This study presents an integrated sidetracking workflow designed to access remaining oil outside the effective sweep of the existing pattern and improve water management without increasing injection pressure. A multidisciplinary workflow was established by integrating geology, reservoir engineering, and drilling. The geological team screened candidate mother wells using wellhead accessibility, structural position, trajectory window, reservoir quality, and nearby oil saturation. A 3D geological model and saturation distribution were used to identify marginal and poorly swept zones. Reservoir engineers then optimized sidetrack placement, horizontal-section length, spacing to injectors and producers, expected production rate, and water-cut risk through dynamic forecasts and sensitivity analysis. The drilling team translated the reservoir target into an executable sidetrack plan, including wellbore architecture, casing integrity review, sidetrack kickoff-point selection, trajectory design, drilling-fluid and cementing programs, and completion design. A dedicated 24/7 technical task force supported real-time decision making, rapid troubleshooting, and cross-discipline updates during execution. The pilot sidetrack was drilled and completed with an actual trajectory matching the planned reservoir target. The well achieved a test rate of 3,000 bbl/d. Initial oil production reached 1,500 bbl/d and subsequently stabilized above 1,000 bbl/d with negligible water production. A second sidetrack well in the same field also delivered more than 1,500 bbl/d of water-free oil, confirming repeatability of the workflow. The pilot demonstrates that sidetracking can monetize remaining oil, defer further pressure escalation on injectors, and improve sweep management in low-permeability carbonate reservoirs. This project delivered the first horizontal sidetrack well in the host country and established a practical, repeatable workflow for sidetrack candidate selection, trajectory optimization, and execution in a low-permeability carbonate waterflood. The approach provides a scalable development option for analogous Middle Eastern carbonate reservoirs where conventional waterflood acceleration is limited by injectivity and surface pressure constraints.

View source

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.