Assessment of post-construction quality of projects: cases from Sinja valley of Nepal
Abstract
Post-construction quality determines whether public investment is converted into durable and usable service, yet small public works in remote mountain municipalities of Nepal are rarely assessed after handover. This study assesses the post-construction quality of completed projects in Sinja Valley of Jumla district, Karnali Province. Its objectives were to evaluate the physical condition, workmanship and functional performance of selected projects; to identify the major quality problems together with their causes and effects; to collect user and stakeholder perceptions of performance and satisfaction; and to identify common defects, strengths and contributing factors as a basis for recommending measures to improve quality management in similar future projects.A mixed-methods design was adopted. Four institutional buildings, three reaches of lined irrigation canal and two community structures, all between two and nine years past handover, were inspected using a structured defect checklist with photographic and dimensional documentation, and in-situ concrete quality was assessed by rebound (Schmidt) hammer testing. A questionnaire survey of 156 purposively sampled respondents was analysed using the Relative Importance Index (RII) and supplemented by three focus group discussions and seven in-depth interviews. Inspection recorded a consistent defect set: honeycombing and cold joints, clear cover as low as 12-15 mm against 40 mm specified, tie spacing exceeding 200 mm in confinement zones, cracking in every building, absent damp-proof course with rising dampness to 600-900 mm, unsealed roof fastener perforations and missing plinth protection. Rebound testing gave a corrected mean of 26.9 for building elements, indicating about 19.6 MPa against an M20 design grade, and 21.2 for canal elements, indicating about 14.6 MPa. The lined canal was dry and non-functional despite full capital expenditure. RII ranked honeycombing and inadequate curing of concrete (0.88), use of substandard or unverified materials (0.86) and corrosion of reinforcement (0.85) as the most significant problems, and skill upgrading of local masons, carpenters and bar-benders (0.85) as the preferred mitigation measure. The study concludes that the defect typology of Sinja Valley matches that reported internationally but that its causal structure does not. The defects arise not from schedule compression within a functioning quality system but from the absence of any operative system: no material testing, no inspection and test plan, no hold points before concealment of work, supervision reduced to measurement for payment, an unenforced defects liability period and an institutional vacuum after handover, compounded by harsh exposure and a working season compressed by frost, monsoon and the fiscal calendar. Remedial effort should be directed at hold-point supervision, access to materials testing, skill upgrading, context-adapted design and funded operation and maintenance.