Aligning a Digital Project Management Tool with People, Process and Technology: Evidence from Trondheim Cathedral School
Abstract
The construction industry is under pressure to digitalise. This paper examines how carpenters and white-collar staff on a major Norwegian building project tested a digital project management tool and how usage could improve production. The study uses a qualitative single-case design at the Trondheim Cathedral School project. Data comprise 18 semi-structured interviews (nine carpenters, eight site-based white-collar staff and one architect), 100 structured observations of carpenters’ tool use, and a document study of tool registrations and project material. Data was analysed through a People–Process–Technology framework. The tool is technically robust and integrated in managerial work, but functionally underutilised among carpenters. In 80 of 100 observations, it was used to access drawings, while functions for checklists, safety reporting, tasks and progress plans were rarely applied. Interviewees highlight fragmented training, inconsistent document structures, limited device access and perceived time loss, especially in piecework, as key barriers. The case shows that digital tools must be aligned with workers’ roles, incentives and workflows rather than assumed to diffuse on their own. The paper proposes role-based training, standardised folder structures, adequate access to equipment, and clearer routines for documentation as practical steps to improve the value of similar tools in Construction 4.0.