Skip to content
Review Open access

A Systematic Taxonomic Review of Risk Modelling and Assessment Methods in Construction Projects (1990–2025)

Aug 2026 · Engineer · Vol 7, pp. 380 · 0 citations · 142 references

Abstract

This study presents a systematic taxonomic review of risk modelling and assessment methods in construction projects over the past 35 years (1990–2025). Through a structured four-stage process, 91 peer-reviewed articles from 15 leading journals were analysed. The taxonomic approach enabled the classification and mapping of methods according to chronological evolution, study type, authorship patterns, and focus areas, while thematic analysis was employed to synthesise key themes, trends, and research gaps. The review examines publication trends, geographical distribution of research contributions, and methodological developments. The findings reveal that the probability-impact (P-I) model remains the dominant approach, despite its well-documented limitations in capturing risk interdependencies and their cascading effects on project quality and overall performance. Fuzzy Set Theory (FST), Analytic Hierarchy Process (AHP), and Monte Carlo Simulation (MCS) emerged as the most frequently adopted techniques. The analysis demonstrates a clear evolution in the field: from predominantly basic probabilistic methods in the 1990s to increasingly sophisticated hybrid, fuzzy logic-based, and AI-enhanced approaches after 2010. Notwithstanding these advancements, significant gaps persist, particularly the lack of integrated frameworks capable of simultaneously addressing risks across multiple project objectives—cost, time, quality, and performance. This review synthesises the state of knowledge in the field, identifies persistent theoretical and practical shortcomings, and offers a comprehensive roadmap for future research. Key directions include the development of machine learning applications, dynamic modelling techniques, and holistic multi-objective risk assessment frameworks to better align risk management theory with the complex realities of modern construction projects.

Read PDF

Similar papers

#artificial intelligence Review Open access Sep 2026

Integrated Time–Cost–Risk Management in Industrial Construction: A Systematic Review and Unified Analytical Taxonomy

Industrial construction projects involve complex interactions among uncertainty, risk, schedule, and cost, motivating the development of advanced analytical and decision-support methodologies. This study systematically reviews methodological approaches to risk assessment and performance management in industrial constru...

Cemil Turan, Maksat Kalybek, Aigul Zhasmukhambetova et al. · 0 citations
Review Aug 2026

“Trends and future directions in purchasing decisions in supply chain management”: a systematic review and bibliometric analysis from pre-to post-pandemic

This study uses the Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) methodology to critically examine and review existing research on supplier selection in supply chain (SC) management before and after the onset of the pandemic. The study explores the nuanced dynamics that influence purc...

Ahlem Dhahri, Waleed Omri, Audrey Bécuwe et al. · 0 citations
Review

ARTÍCULOS ORIGINALES

Julían Andrés, Zapata-Cortes, G. Férnandez-Alonso et al. · 0 citations
Review Open access Sep 2026

Evaluating the efficacy of risk management practices for generative AI integration in sustainable construction projects: a fuzzy set theory approach

This study assesses the significance of risks associated with integrating Generative Artificial Intelligence (GenAI) into risk management for sustainable construction projects (SCPs). Given the early stage of GenAI adoption in the construction sector, the study adopts an exploratory approach to evaluate how industr...

Mohamed Abdelwahab Hassan Mohamed, M. K. Al-mhdawi · 0 citations
Review Open access 2026

Cost Predictive Model Adoption in Construction Organisations: A Pilot study

Accurate construction cost estimation is essential for effective project planning, budgeting, and decision-making. The increasing complexity of construction projects has accelerated the adoption of advanced cost predictive models that complement traditional estimation techniques. However, limited empirical evidence exi...

Hanafi bin Ab. Haris, Norhazren Izatie Mohd, Hamizah Liyana Tajul Ariffin et al. · 0 citations
Review Open access Sep 2026

A multi-criteria approach to risk assessment and mitigation in UAE oil and gas construction projects: a hybrid Delphi–Fuzzy AHP framework

Oil and gas construction projects (O&GCPs) are among the most complex and high-stakes endeavors in the world. In the UAE, these projects operate under demanding safety and regulatory environments, yet persistent risk-related disruptions continue to undermine project performance. Existing risk management frameworks rare...

Raghad Almashhour, Abroon Qazi, M. K. Al-mhdawi · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.