2026· IEEE Transactions on robotics· Vol 42, pp. 2952-2971· 0 citations· 55 references
Computer Science
Abstract
This article investigates the time-constrained multirobot efficient search (MuRES) problem, focusing on the asynchronous coordination among multiple robots. To the best of authors’ knowledge, almost all MuRES solutions adopt the synchronous decision-making framework, wherein the robots act simultaneously. The synchronous assumption simplifies the MuRES problem formulation and facilitates the development of coordination search strategies. However, in real-world scenarios, spatial variability and heterogeneous motion characteristics render the synchronous execution scheme inefficient, leading to large idle time and poor task allocation. To address these limitations, we introduce the multiagent asynchronous probability-decomposed policy gradient (MA-APD) algorithm, which targets the asynchronous multirobot efficient search problem. MA-APD comprises two core components: first, the generalized value function approximation module, which evaluates and asynchronously decomposes the nonconvex time-constrained MuRES objective, and second, the asynchronous policy gradient module, which maps the decomposed value function onto individual robot’s decision-making timeline, enabling the asynchronous actor updates. To improve MA-APD’s sample efficiency and training stability, we further introduce an off-policy learning mechanism, a soft update module, and an entropy regularization term. Extensive simulation results in canonical MuRES environments indicate that MA-APD consistently outperforms canonical MuRES solutions as well as multiagent reinforcement learning algorithms. Furthermore, MA-APD is deployed to a physical multirobot system for moving target search in both self-constructed and realistic indoor environments, validating its practical effectiveness.
New techniques to consider asynchronous actions when distributing the sub-optimality bound among the agents and when selecting nodes for expansion during planning are developed.
Xue-Mian Wu, Shi-Zhe Zhao, Zhong-Qiang Ren· Proceedings of the Internati...· 1 citation
This work formulate large-scale MAPP as a partially observable networked Markov decision process as a decentralized model-based Actor-Critic using the Kronecker-factored trust region (DM-ACKTR) algorithm, which consistently obtains the highest TCR and lowest CR.
Ye-Min Liu, Jin-Hao Yang, Xiang-Yu Ma et al.· Electronics· 0 citations
This article investigates heterogeneous high-order nonlinear multiagent systems (MASs) under an event-triggered mechanism (ETM) and proposes an approximately optimal consensus protocol derived by solving the Hamilton-Jacobi-Isaacs (HJI) equation with the proposed actor-critic-identifier (ACI) learning framework.
Xing-Yu Gao, Zhi-Hong Liu, Choonki Ahn et al.· IEEE Transactions on Cyberne...· 0 citations
This paper examines the problem of coordinating the observations of multiple agents constrained to periodic trajectories that communicate asynchronously with a central planner. We are motivated by settings such as active monitoring missions tracking stochastic and spatially spreading events like wildfires or flooding,...
David Fornos, Federico Rossi, Dylan A. Shell et al.· IEEE International Conferenc...· 0 citations
A new diffusion method for multi-agent planning with STL specifications is introduced, making the approach generalizable to novel formulas whose predicates are placed anywhere within the goal region covered during training, while achieving the same scalability as existing learning-based methods.
Joe Eappen, Zikang Xiong, S. Iyengar et al.· IEEE Robotics and Automation...· 0 citations
DGA and DMCHBA remained viable and stable in every tested condition, while ACBBA, PI, and DGA lost stability or viability as communication degraded, and Static and execution-integrated computation rankings diverged as task load increased.
J. Lott, Vahraz Honary· 1 citation
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.